Page | Name Of The Centre | Hour | Visit ing Date | No. Pond | Total Area M2 | Ph | T° | S d cm | Max Dept | H a tc | Altitude | Latitude | Longitude | Co |
P3 | Kibos Fpc | 13.00 | 03/7/96 | 15 | 18,109 | 7.5 | 27 | 25 | 1.00 | Y | 1,215 | 00° 02' 52" S | 034° 49' 33"E | 9 |
P6 | Yala Fpc | 15.00 | 04/7/96 | 9 | 4,790 | 6.0 | 26 | 35 | 0.88 | Y | 1,361 | 00° 05' 49" S | 034 32' 22" E | 9 |
P11 | Alupe Fpc | 9.00 | 05/7/96 | 8 | 4,983 | 7.5 | 25 | 20 | 1.10 | Y | 1,101 | 00° 30' 07"N | 034° 08' 05" E | 9 |
P18 | Wahungu Fish Farm | 15.30 | 05/7/96 | 8 | 3,125 | 7.8 | 27 | 40 | 0.80 | N | 1,289 | 00° 16' 58" N | 034° 08' 14" E | 8 |
P23 | Kokwanyo Fish Farm | 17.30 | 08/7/96 | 8 | 21,307 | 8.5 | 25 | 20 | 1.10 | N | 1,464 | 00° 26' 54" S | 034° 50' 27" E | 9 |
P25 | Rongo Fpc | 9.50 | 09/7/96 | 9 | 3,210 | 7.0 | 22 | 17 | 0.86 | Y | 1,415 | 00° 45' 36" S | 034° 35' 57" E | 9 |
P55 | Borabu Fpc | 16.30 | 11/7/96 | 5 | 2,348 | 7.3 | 22 | 40 | 0.86 | Y | 1,765 | 00° 42' 39" S | 035° 02' 55" E | 7 |
P68 | Lugari Fpc | 9.30 | 16/7/96 | 9 | 6,560 | 7.2 | 18 | 40 | 0.80 | Y | 1,717 | 00° 41' 50" N | 034° 57' 55" E | 8 |
P72 | Chwele Fpc | 14.30 | 16/7/96 | 10 | 7,692 | 7.5 | 24 | 22 | 0.80 | Y | 1,696 | 00° 43' 50" N | 034° 34' 48" E | 9 |
Total | 81 | 72,124 | ||||||||||||
Average | 7.4 | 24 | 28.7 | 0.91 | 1,447 |