ANNEXES(continue)

ANNEX 14.a.

 PILOT HATCHERY PRODUCTION FACILITY
LOCATION - SINN FARM
INVESTMENT BUDGET SPECIFICATION
 

 All amounts in US$

ItemDescriptionpcs.Unit PriceTotal AmountSub Totals
      
1.Construction and main building works  99 580
1.1.Land filling and levelling, area of 36 × 80 m, m33240516 200 
1.2.Central building with water header tanks, m27018012 600 
1.3.Plankton production building, m214618026 280 
1.4.Reinforced concrete base for greenhouses, m210401212480 
1.5.Front and rear greenhouse panels, complete41 4005 600 
1.6.Grreehouse tunnel with insulated polyethylene cover, m210402323 920 
1.7.Vehicle access paths11 7001 700 
1.8.Gardening works1800800 
2.Sea water supply and filtration system for larvae, fry and broodstock69 600
2.1.Sub-sand sea water filtration at beach, incl. excavation works, drainage pipes, and 2 concrete pump sumps17 8007 800 
2.2.Twin polyethylene delivery pipes, 200 mm diameter, from beach to header tanks, incl. excavations, m2005010 000 
2.3.Submersible sea water pump, h=8m, q=24lit/sec, 5.5 kW43 30013 200 
2.4.Electrical and mechanical pump installation12 1002 100 
2.5.Mechanical drum filter with 18 mm mesh,112 50012 500 
2.6U.V. sterilisation system, for flow of 4 m/sec.16 3006 300 
2.7.PVC pipes, fittings, and installation15 0005 000 
2.8.PVC valves, 25 mm – 90 mm60603 600 
2.9.Freshwater supply system to header tanks & broodstock1700700 
2.10.Pump for freshwater, h=5m, q=8lit/sec, 1.5 kW21 3002 600 
2.11.Discharge channels and pipes13 1003 100 
2.12.Connection to Sinn farm water discharge system, meters90302 700 
3.Sea water supply and filtration to Plankton section   8 270
3.1.Primary filter, 5 micron11 4001 400 
3.2.Secondary filter, 1 micron1600600 
3.3.U.V. Sterilization12 1002 100 
3.4.Centrifugal pumps26001 200 
3.5.PVC pipes, fittings, and installation11 1001 100 
3.6.PVC valves, 16 mm – 40 mm2430720 
2.9.Freshwater supply1450450 
2.11.Discharge channels and pipes1700700 
4.Sea water aeration system   13 640
4.1.Centrifugal air blower, 100m3/hr at 0,25 bar; 2.2 kW42 3009 200 
4.2.PVC pipes, fittings, and installation11 6001 600 
4.3.Injection valves and diffusers11 5001 500 
4.4.Surface cleaners for larval tanks880640 
4.5.Emergency oxygen supply system to fry tanks1700700 
5.Tanks and equipment: Plankton section   47 790
5.1.Phyto tank, FBG, diam. 2 m, height 0.6 m, vol. 1.5 m388006 400 
5.2Rain cover for above phytoplankton tanks1600600 
5.3.Phytoplankton bags Neon Illumination frame37002 100 
5.4.Phytoplankton flasks culture table11 0001 000 
5.5.Phytoplankton PVC bags1600600 
5.6.Air conditioning phytoplankton room11 8001 800 
5.7.Rotifer tank, FBG, diam. 0.8 m, height 1.1 m, vol. 500 l65003 000 
5.8.Rotifer tank, FBG, diam. 2 m, height 1.2 m, vol. 2.5 m351 4007 000 
5.9.Artemia tank, FBG, diam. 0.8 m, height 1.3 m, vol. 600 l105605 600 
5.10.Artemia decapsulation equipment1900900 
5.11.llumination above phyto, rotifer and artemia tanks20851 700 
5.12.Furniture plankton preparation laboratory12 6002 600 
5.13.Laboratory analytical balance, precision 10 mg11 2001 200 
5.14.Electronic balance, precision 1 g1150150 
5.15.Low magnification Stereo microscope12 2002 200 
5.16.High magnification microscope11 6001 600 
5.17.Autoclave11 7001 700 
5.18.Small equipments and glassware14 0004 000 
5.19.Assorted strainers, filters, buckets, etc.11 6001 600 
5.20.Electrical heaters for Artemia and rotifer tanks121702 040 
6.Tanks and equipment: Larvae section  38 050
6.1Larval tank, FBG, diam. 3 m, height 1.2 m, vol. 7 m364 00024 000 
6.2.Raised wooden walkway around tanks12 2002 200 
6.3.Neon illumination above tanks685510 
6.4.Outlet filters18801 440 
6.5.Automatic plate feeders, 24 V ac,65503 300 
6.6.Electrical individual tank heaters, 2 kW123003 600 
6.7.Small equipments and installation13 0003 000 
7.Tanks and equipment: Fry section  50 100
7.1Raceway tank, concrete, 11 m × 1.8 m, vol. 20 m381 50012 000 
7.2.Neon illumination above tanks885680 
7.3.Outlet filter screens321103 520 
7.4.Automatic plate feeders, 24 V ac,165508 800 
7.5.Fry grading and counting equipment15 0005 000 
7.6.Feed store with freezer13 4003 400 
7.7.Push trolleys43001 200 
7.8.Oxygen control and alarm system, 8 - channel18 0008 000 
7.9.Oxygen dosage valves interfaced to above12 8002 800 
7.10Portable oxygen metre,28501 700 
7.11.Small equipments and installations13 0003 000 
8.Tanks and equipment: broodstock section   42 300
8.1.Holding tanks, concrete, 5 m × 3 m, volume 15 m361 3007 800 
8.2.Spawning tanks, concrete, 2.4 × 3 m, volume 7 m328001 600 
8.3.Neon illumination above tanks885680 
8.4.Curtain separation for individual tanks81501 200 
8.5.Incubation tanks, FBG, diam 0.8 m, vol. 500 lit65003 000 
8.6.Electrical heaters, 2kW43001 200 
8.7.Electrical heaters, 500 W4180720 
8.8.Sea water cooling system114 00014 000 
8.9In-tank recirculation filter61 1006 600 
8.10.Egg concentrators, and fishing equipment12 5002 500 
8.11.Small equipments and installations13 0003 000 
9.Electricity   47 000
9.1.Electricity transformer station, 100 kVA16 0006 000 
9.2.Emergency electricity generator, 100 kVA128 00028 000 
9.3.Main control panel13 0003 000 
9.4.General electricity distribution110 00010 000 
10.General Equipment   13 600
10.1.Transpallet carrier29001 800 
10.2.Ventilation tans in greenhouses82502 000 
10.3.Fry transport tank, 2 m3, with oxygen supply22 4004 800 
10.4.Miscellaneous15 0005 000 
11.Office Equipment   5 450
11.1.Telephone and fax machine11 0001 000 
9.2.Personal computer11 4001 400 
9.3.Bubble-jet printer1550550 
9.5.Office furniture12 5002 500 
10.Car118 00018 00018 000
11.TOTAL453 380
12.Unforeseen10% 45 340 
13.Design and Supervision  50 000 
 TOTAL HATCHERY PROJECT INVESTMENT  548 720 

ANNEX 14.b.
OPERATIONAL EXPENSES OF 1 MILLION FRY PILOT HATCHERY FACILITY

ITEM / DESCRIPTIONQuantityUS$

Broodstock fish, kg30024.000
Live fish eggs, kg825.600
Larval feed, kg1.50060.000
Electricity, kW500.00012.500
Transports and travel 6.000
Consumables and small items 12.000
Workers819.200
Technicians516.000
Biologists / Manager314.400
Maintenance 22.000
Administration and miscellaneous 6.000

Depreciation and bank interests* 98.496
Total Production Costs 316.196

Production Costs per fry (US$) 0,32
Production Costs per kg (SY£)16 

* Based on 100% financing of capital costs.
Assumes operational expenses provided by investor.

ANNEX 15.

 PILOT 100 TON LAND-BASED FARM
LOCATION - OCEANOGRAPHIC CENTER
INVESTMENT BUDGET SPECIFICATION
 

 All amounts in US$

ItemDescriptionpcs.Unit PriceTotal AmountSub Totals
      
1.Construction and main building works   380 092
1.1.Land filling and levelling, area of 50 × 200 m, m29999879 992 
1.2.Central building with water header tanks, m22006012 000 
1.3.Production control building, m216020032 000 
1.4.Reinforced concrete base for tanks, m245001567 500 
1.5.Storehouse for feed, and packing facility, m21201 400168 000 
1.6.Shade cover for tanks, m24000416 000 
1.7.Vehicle access paths13 0003 000 
1.8.Gardening works11 6001 600 
2.Sea water supply and filtration system for larvae, fry and broodstock 212 700
2.1.Seawater intake at sea, at 5 m depth, incl. excavation works, drainage pipes, and 2 concrete pump sumps120 00020 000 
2.2.Twin polyethylene delivery pipes, 630 mm diameter, from beach to header tanks, incl. excavations, m9035031 500 
2.3.Submersible sea water pump, h=8m, q=500 l/s, 75 kW428 000112 000 
2.4.Electrical and mechanical pump installation18 0008 000 
2.5.Mechanical drum filter with 90 micron mesh,118 00018 000 
2.6.Discharge channels and pipes116 00016 000 
2.7.Discharge to sea, m601207 200 
4.Sea water aeration system   42 800
4.1.Centrifugal air blower, 500m3/hr at 0,2 bar; 11 kW35 50016 500 
4.2.PVC pipes, fittings, and installation14 8004 800 
4.3.Injection valves and diffusers14 5004 500 
4.4.Oxygen storage station114 00014 000 
4.5.Emergency oxygen supply system to fry tanks13 0003 000 
7.Tanks and equipment   406 900
7.1Raceway tank, concrete, 50 m × 4 m, vol. 240 m31518 000270 000 
7.2.Raceway inlet channel and furnishings151 20018 000 
7.3.Outlet filter screens6025015 000 
7.4.Centralised feeding system168 60068 600 
7.5.Oxygen control and alarm system, 8 - channel28 00016 000 
7.6.Oxygen dosage valves interfaced to above22 8005 600 
7.7.Portable oxygen metre,28501 700 
7.8.Small equipments and installations112 00012 000 
9.Electricity 122 000
9.1.Electricity transformer station, 300 kVA118 00018 000 
9.2.Emergency electricity generator, 160 kVA236 00072 000 
9.3.Main control panel112 00012 000 
9.4.General electricity distribution120 00020 000 
10.General Equipment 42 000
10.1.Transpallet carrier29001 800 
10.2.Forklift truck118 00018 000 
10.3.Fish harvest, ice and packing113 60013 600 
10.4.Laboratory equipment186008 600 
11.Office Equipment 11 100
11.1.Telephone and fax machine11 0001 000 
9.2.Personal computer and printer11 9501 950 
9.3.Photocopier A411 1501 150 
9.5.Office furniture17 0007 000 
10.Pick-up car118 00018 00018 000
11.TOTAL1 235 592
12.Unforeseen10% 123 560 
13.Design and Supervision  80 000 
 TOTAL LANDBASED FARM PROJECT INVESTMENT  1 439 152 

ANNEX 16.

SUMMARY MARINE AQUACULTURE PILOT PROJECT PROPOSAL

FACILITYONGROWING CAGE FARMPREGROWING CAGE FARMHATCHERY

 PHASE ONEOPTIONAL

CAPACITY100 TONS FISH
average size 380 g
350,000 FINGERLINGS
average size 25 g
1,000,000 FRY
average size 1 g
OUTPUT 1st Season100 TONS290,000400,000
PROJECT LOCATIONLATAKIA PORT-HARBOURSINN / OCEAN CENTRE
INVESTMENTUS$ 500,000,-US$ 550,000,-
OPERATIONAL COSTSUS$ 400,000,-US$ 120,000,-
SALES 1st SeasonUS$ 800,000,-US$ 150,000,-
TRAINING6–8 man-months8 man-months
TECHN. ASSIST.29 man-months24 man-months

 PHASE TWOOPTIONAL

CAPACITY300 TONS FISH
average size 380 g.
1,2000,000 FINGERLINGS
average size 25 g
1,000,000 FRY
average size 1 g
OUTPUT 2nd Season300 TONS960,0001,000,000
PROJECT LOCATIONLATAKIA OFFSHOREHARBOURSINN / OCEAN CENTRE
INVESTMENTUS$ 750,000,---
OPERATIONAL COSTSUS$ 1,200.000,-US$ 260.000,-
SALES 2nd SeasonUS$ 2,400.000,-US$ 360.000,-
TRAINING--
TECHN. ASSIST.20 man-months12 man-months

Note: Operational costs are lower than in Annex 10. since investment depreciation is not considered

SUMMARY MARINE AQUACULTURE PILOT PROJECT PROPOSAL

FACILITYONGROWING CAGE FARMPREGROWING CAGE FARMHATCHERY

 PHASE ONEOPTIONAL

CAPACITY100 TONS FISH
average size 380 g
350,000 FINGERLINGS
average size 25 g
1,000,000 FRY
average size 1 g
OUTPUT 1st Season100 TONS290,000400,000
PROJECT LOCATIONLATAKIA PORT-HARBOURSINN / OCEAN CENTRE
INVESTMENTUS$ 500,000,-US$ 550,000,-
OPERATIONAL COSTSUS$ 400,000,-US$ 120,000,-
SALES 1st SeasonUS$ 800,000,-US$ 150,000,-
TRAINING6–8 man-months8 man-months
TECHN. ASSIST.42 man-months24 man-months

 PHASE TWOOPTIONAL

CAPACITY300 TONS FISH
average size 380 g.
1,2000,000 FINGERLINGS
average size 25 g
1,000,000 FRY
average size 1 g
OUTPUT 2nd Season300 TONS960,0001,000,000
PROJECT LOCATIONLATAKIA OFFSHOREHARBOURSINN / OCEAN CENTRE
INVESTMENTUS$ 750,000,---
OPERATIONAL COSTSUS$ 1,200.000,-US$ 260.000,-
SALES 2nd SeasonUS$ 2,400.000,-US$ 360.000,-
TRAINING--
TECHN. ASSIST.20 man-months12 man-months

Note: Operational costs are lower than in Annex 10. since investment depreciation is not considered