Previous Page Table of Contents Next Page


Annex 11
RESEARCH SECTOR: RESOURCES AVAILABLE

COUNTRYINFRASTRUCTUREEQUIPMENTFINANCESHUMAN RESOURCES
LABSSTATIONSUSERQUANTITYQUALITYUSEQUANTITY
(US $ eq)
ORIGINAVAILAB.QUANTITYPROFESSIONAL PROFILEACTUAL EMPLOYMENT
IVBCVarious (wet/dry) hatchery Offices library (2) feed prog.2BW (Ponds/encl (+ tanks) 2.2 haFullWell equipped variousGoodFullIDESSA
37000
74000
64500
5600
(1992)
Govt
IDRC
CCCE
FAC
in useIDESSA
4.5 sen.nat.
2.0 sen.intem
8 med. lev.
Hydrobiologist
Forestry Engin.
Fish. Engin.
MSc/BSc
 
1 FW (ponds/ tanks + raceways) 2.8 haFullCRO(1993) Govt ORSTOM CCCE BAD/FAD EECIn useCRO 6 sen. intern 11 sen. intern 1 med. lev.Agric. Engin. PhD Nutrition Biologist MScFull time
NIRVarious (wet/dry) hatcheries Libraries Feed proc. labs2 BW (ponds/ tanks 9.30 haFullLack some kinds equip.GoodFull15000
NIOMR + NIFFR (1990)
DFRRI68 000
(1989)
NIOMR
18 Sen. Nat
PhD (2)
MSc/BSc
Full time
2 FW (ponds/ tanks 5.50 haFullNIFFR
5 Sen. Nat.
MSc/BSc
CMR1 dry lab1 in part concr. tanks av. sites
1 in full
Little1 lab well equipped, variousGoodIncreasing645 000
(1991–94)
AGCD/KULIn use7 Sen. Nat.
2 Sen. Int
5 Med. lev
BiologistsLimited
(nationals)
1 dry lab hatchery19+ ponds 0.40 haFull
PRC1 small dry lab/office1 in part 15 pondsLittleSmall basicGoodLittle3 × 10000 35000IFS
ADF
Spent In use3 sen. natRural devel vet. an.husb.Limited
0.467 ha 3500/year (1983 -) Govt In use 3 med. level Agricult an. husb. Limited
RCA2 labs hatchery1 station
44 ponds
9 ha
LittleSmallPoorNilNil
(1993)
-Nil
(1993)
1 sen. nat.
10 med level
Forestry Engin.Nil
RWA1 dry lab.
offices, hatchery, wet lab. feed store
1 in part
51+ ponds
3.1+ ha
FullWellequipped variousGoodFull428 000EECOn-going3 sen. natAgricult. Eng BiologistFull time
144 000/year (1989–95)USAID/CRSPin use 
125 000/yr (1992–95)AGCD/KULIn use3 sen. int
42 000/yr In use3 med. level
 Govt/Univ  
MAG1 small lab hatchery8 FW
3.80 ha
MediumSmallGoodLittle9 800GovtIn use2 sen.
5 med. lev.
BiologistsLimited
1 MW
8.00 ha
Full
KENKMFRI
2 labs
4 stationsLittle, basicWell equipped, variousGoodLittle Govt.
IDRC
World Bank
AGCD/KUL
(starting)
In use41 sen.nat.
20 med. level
BiologistsLimited
Baobab
1 lab hatchery
Univ. Nat 2 labs
Sagana
15 ponds
15 ha
URT2 labs
(fisheries)
NoneMediumLack of some equipment-Full
(SWB)
7% DOF budget for all fisheriesGovtnone6 sen. nat.Aquacult. (biol.)
PhD(1), MSc(1)
Very ltd
MLW2 wet labs3 main stations (196+ 37 + 25 ponds) 7 small stations (75 ponds)partially mainly at Domasi and MzuzuWell equippedGoodFull50 000ICLARM
CEC
FAO/ALCOM
In use10 MSc
42 med. lev.
Aquacult. (biol.)Part time on research
ZAM2 wet labs
(Chilanga Mwekera)
1 + (5)
140 ponds
Very littleBasicPoorLittle50 000FAO/ALCOM
JICA
NORAD
UNDP
In use10 graduatesAquacult. (biol)Little time on research
ZIM2 wet labs Mazoe Kariba8. e.g. 70 ponds × 400 sqm 19 ponds = 1 ha. etc…Very littleBasicGoodLittle   29 (nationals)Aquatic ecologistsVery little on aquacult.

Previous Page Top of Page Next Page