Previous Page Table of Contents Next Page


2. Terms of Reference

The terms of reference of the Hatchery Engineering Consultant were as follows:

To visit the sites in the project States where the hatcheries are being constructed; identify further sites if required and supervise hatchery construction work and train FSDC engineering staff on hatchery design and construction as well as supervision.


Previous Page Top of Page Next Page