ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
1.01 |
PRIORITY AREA: |
Land Use and Resources/Forestry in Land Use |
PROJECT TITLE: |
Intensive small ruminant production |
DURATION: |
Three years |
BENEFICIARIES: |
The people of Union Island |
BACKGROUND
Union Island is an extremely dry island. There are two towns where most of the population live. The people are generally poor and rely mainly on fishing and raising animals extensively for their upkeep (mainly sheep and goats but also cattle). Due to the dry nature of the is land, fodder and water for animal rearing are in extremely short supply. Farmers resort to clearing trees or simply allowing relatively large numbers of animals to graze the hillsides. This results in significant degradation of the environment. Any attempt to re-vegetate damaged areas will be quickly destroyed by roaming, hungry animals. Due to the harsh environment in which the animals are reared, productivity is very low. The farmers' response to this is to increase the number of animals they own. This cycle of increased animal numbers in response to low productivity is a typical response by resource -poor farmers but is extremely wasteful and destructive to the environment. The cycle must be broken and the damage repaired before the island becomes desert-like.
OBJECTIVES
General
To harmonize livestock production activities on Union Island with environmental concerns.
Specific
a. To improve the productivity of animals by proper management.
b. To maintain or increase the benefits that farmers now obtain from raising livestock.
c. To preserve the. integrity of the physical environment of Union Island.
ACTIVITIES
1. Education programme to make farmers aware of the low level of productivity now being experienced, the effects of this and the potential for improvement. The raising of cattle should also be discouraged.
2. Reduction of the animal population to one-third by the purchase of all but 500 head of adult sheep and goats on the island for sale to another project that is developed in this document (Project 1.02).
3. Construction of pens on farmer's holdings to house all remaining small ruminants.
4. Provision of supplemental feed and water to animals in pens. Animals must have drinking water available at all times. Tanks which collect run-off water from the roof of pens will assist.
5. Establishment of the fodder (Acacia mangium and sorghum) on 80 ha. for cut and carry feeding.
INPUTS
Planting materials
Pen construction materials
Supplemental feeds.
OUTPUTS
The same or higher quantity of mutton and chevron produced. Higher quality output which will have expanded market opportunities.
NATIONAL LEAD IMPLEMENTING AGENCY
The Ministry of Agriculture, Industry and Labour.
CONDITIONS
Farmers must be convinced of the poor productivity and its effects, both economic and environmental.
Co-ordination and co-operation between the Divisions of Animal Health and Production, Forestry and Extension.
PROJECT BUDGET
(a) Government Contribution |
EC$ 0.3 million |
(b) Donor Contribution |
US$ 0.5 million |
(c) Total Contribution |
EC$ 1.5 million |
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
1.02 |
PRIORITY AREA: |
Land Use in Resources/Forestry in Land Use. |
PROJECT TITLE: |
Integrated Agroforestry/Livestock Production. |
DURATION: |
3 years |
LOCATION: |
Rabacca farms or other suitable location. |
BENEFICIARIES: |
Farmers, rural poor. |
BACKGROUND
Banana farmers also produce livestock. However, they concentrate on banana cultivation with little management applied to the livestock. Also, the links between crops and livestock are not fully exploited. The results are low efficiency and productivity of livestock and possibly, by extension, of the overall system.
OBJECTIVES
General
To demonstrate the benefits of an integrated crop/livestock production system.
Specific
To increase the yield per ha. of banana.
To increase the yield of livestock in the system.
To reduce the dependence on charcoal or petroleum products for cooking.
ACTIVITIES
1. Selection of 50 farmers in the Rabacca or other suitable area with at least 2 ha of land per farm.
2. Establishment of 0.4 ha of Gliricidia. 0.4 of pasture and 1 to 1.2 ha banana on each farm.
3. Construct facilities to house 20 adult sheep and followers, 1 cow and calf, a pen for fattening a calf to market, housing for 2 sows with farrowing facilities, pens for fattening piglets to markets and a biogas plant.
INPUT
Planting material - grass cuttings, Gliricidia seedling (or stem cuttings). Materials and labour for construction of pens. Supplemental feed for animals. Supervisory and advisory staff.
OUTPUTS
Banana, milk, beef, pork, mutton, biogas.
Information on integrated production units for development planning purposes.
NATIONAL LEAD IMPLEMENTING AGENCY
Ministry of Agriculture, Industry and Labour.
CONDITIONS
Co-operation of farmers, supplemental feed supply, co-operation and co-ordination between the Divisions of Animal Health and Production, Forestry and Extension and CARDI.
PROJECT BUDGET
(a) Government Contribution |
EC$ 0.2 million |
(b) Donor Contribution |
US$ 0.5 million |
(c) Total Contribution |
EC$ 1.2 million |
N.B. Ideally, animal and crop waste should be treated in a biogas plant, gas obtained used for cooking and treated effluent applied to the crops. This may not be possible on Rabacca farms because of the mandated separation between housing and farming activities. In such instances, the livestock may be established near the crops. Gas produced can be used to provide animals with light at night and to cook crop waste such as banana and root crops before feeding to livestock. Cooking hydrolyses the starch and makes the material more digestible by pigs.
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
1.03 |
PRIORITY AREA; |
Land Use in Resources/Forestry in Land Use. |
PROJECT TITLE: |
Evaluation of an agroforestry/livestock project. |
DURATION: |
5 years |
LOCATION: |
The Colonarie Watershed or other suitable area, St. Vincent |
BENEFICIARIES: |
The Local Community |
BACKGROUND
Banana production is taking place on sloping soils which are generally not being protected from erosion. This leads to soil loss and eventually to lower land productivity and siltation of water. Also, the suspected over-use of chemicals, including fertilizers, is causing grave concerns. Farmers also raise livestock which are generally not well fed. Charcoal use in the community is significant. Material for its production is being obtained by indiscriminate cutting of forest trees. A study of the community by Trevin et al shows that farmers are not averse to intercropping with trees but the preference is for fruit trees. Most farmers prefer to use trees in line planting on the boundaries.
OBJECTIVES
General
To evaluate the effects of alley cropping bananas with multipurpose trees species.
Specific
a. To evaluate the yield of banana alley cropping with a multipurpose tree.
b. To evaluate the yield of fuelwood produced.
c. To evaluate the yield of fodder produced and its contribution to the livestock component on the farm.
d. To evaluate the acceptance of this agroforestry system by farmers.
ACTIVITIES
1. Production of necessary seedlings by Forestry Department.
2. Selection of 10 farmers who are willing to co-operate with the objectives of the programme.
3. Establishment of Leucaena on 10% of the area (alley cropping) along the contour.
4. Divide farmers into two groups. Group A will grow Leucaena as a tree crop for three years with no cutting in that time. At the end of that period, the trees will be harvested to yield fodder for animals and wood for charcoal.
Group B will coppice Leucaena regularly to be used as fodder for livestock.
INPUT
Seedlings of giant Leucaena
Labour to establish seedlings
Fertilizer
Advisory and supervisory personnel
OUTPUT
Information regarding potential for production, economics and social acceptance of this agroforestry technique in St. Vincent.
NATIONAL LEAD IMPLEMENTING AGENCY
Ministry of Agriculture, Industry and Labour.
PROJECT BUDGET
(a) Donor Contribution |
US$ 0.3 million |
(b) Government Contribution |
EC$ 0.5 million |
(c) Total Contribution |
US$ 0.5 million |
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
1.04 |
PRIORITY AREA: |
Land Use and Resources/Forestry in Land Use |
PROJECT TITLE: |
Land Use Management on Union Island |
DURATION: |
Three years beginning in year 2 (1995) |
LOCATION: |
Union Island |
BENEFICIARIES: |
i) Union Islanders generally |
BACKGROUND
In Union Island all land use activities are affected by uncontrolled grazing of livestock (particularly goats and sheep) during the dry season. This problem affects both forestry and agricultural activities on the island. As a consequence it leads to loss of: forest cover, biodiversity and wildlife habitats as well as the reduced potential of the forest to yield forest products. Mangroves are threatened by commercial development, etc. The island has an area of 838 ha with approximately 30% of the land being Crown Land. It has a low rainfall and pronounced dry season.
OBJECTIVES
General
i) To reverse the effects of uncontrolled grazing on loss of forest cover, biodiversity and wildlife habitat.
ii) To have more balanced land use on Union Island.
Specific
i) To establish, a project planning team and project coordinating committee.
ii) To prepare a land use plan for Union Island which will incorporate specific projects and programmes.
iii) To implement the land use plan, especially through the implementation of specific projects and programmes.
iv) To evaluate individual projects and programmes and revise the plan periodically.
ACTIVITIES
i) Obtain approval of project and secure technical assistance as required.
ii) Selection of a Project Planning Team and a Project Coordinating Committee.
iii) Organize meetings of the Team and the Committee.
iv) Collect relevant data and prepare a draft Land Use Plan.
v) Discuss the draft plan with the Coordinating Committee, general public and special groups and redraft the plan accordingly.
vi) Obtain relevant approval for the plan.
vii) Obtain budgetary provisions (and grant funding if necessary) for plan implementation.
viii) Implement the plan (projects and programmes under the plan).
ix) Do periodic evaluation of the projects and programmes under the plan and do plan revisions as are found to be necessary.
INPUTS
Equipment/Infrastructure
Office, conference room and rest house facilities on Union Island (rental)
A four wheel drive vehicle (Rental or one shipped from St. Vincent)
Field and office equipment
Personnel
1 Land Use Planner
1 Forest/Natural Resource
Management Expert
1 Livestock Expert
1 Agricultural Crops Expert
Miscellaneous short term experts in Fisheries, Tourism (especially Ecotourism) and Watershed Management Counterpart Staff Workers
OUTPUTS
i) Control of the overgrazing problem
ii) Land Use Plan for Union Island
iii) Forestry, recreation, livestock, agricultural crop and other development projects and programmes for Union Island
iv) Better trained officers in Integrated Land Use Management and Plan Implementation
v) A greater forestry presence in Union Island
NATIONAL LEAD IMPLEMENTING AGENCY
Forestry Division, Ministry of Agriculture, Industry and Labour (in collaboration with relevant interest groups on Union Island).
CONDITIONS FOR SUCCESS/SPECIAL OBSERVATIONS
i) The stationing of at least one Forest Officer, and preferably, two, on Union Island.
ii) Funding for the project.
iii) Cooperation from relevant interest groups on Union Island.
iv) It may be best to start this project in the second year of the National Forestry Action Plan so that the framework of the proposed Forestry Division Project: Phase II Project 5.01 will already be in place and will provide some of the expertise needed for this project.
PROJECT BUDGET
(a) Donor Contribution |
US$ 1,248,000 |
(b) Government Contribution |
US$ 88,890 (EC$ 240,000) |
(c) Total Contribution |
US$ 1,336.890 |
DONOR CONTRIBUTION (US$)
i) Equipment and Infrastructure
Item |
Cost by Year |
|||
YEAR 2 |
YEAR 3 |
YEAR 4 |
Total |
|
Field equipment |
5,000 |
1,000 |
1,000 |
7,000 |
Office equipment |
10,000 |
- |
- |
10,000 |
Office supplies |
2,000 |
2,000 |
2,000 |
6,000 |
Rental of office space & rest house facilities |
10,000 |
1,000 |
1,000 |
12,000 |
Miscellaneous |
1,000 |
1,000 |
1,000 |
3,000 |
Sub-total |
28,000 |
5,000 |
5,000 |
38,000 |
ii) Personnel
Position |
Cost by Year |
|||
YEAR 2 |
YEAR 3 |
YEAR 4 |
Total |
|
1 Land Use Planner |
100,000 |
100,000 |
100,000 |
300,000 |
1 Forest Natural Resource Management Expert |
80,000 |
- |
- |
80,000 |
1 Livestock Expert |
80,000 |
80,000 |
- |
160,000 |
1 Agricultural Expert |
80,000 |
- |
- |
80,000 |
Short-term Experts |
80,000 |
40,000 |
40,000 |
160,000 |
Sub-total |
420,000 |
220,000 |
140,000 |
780,000 |
iii) Other
Item |
Cost by Year |
|||
YEAR 2 |
YEAR 3 |
YEAR 4 |
Total |
|
Miscellaneous payments |
210,000 |
110,000 |
70,000 |
390,000 |
Administrative expenses including printing of plan |
10,000 |
20,000 |
10,000 |
40,000 |
Sub-total |
220,000 |
130,000 |
80,000 |
430,000 |
GRAND TOTAL |
668,000 |
355,000 |
225,000 |
1,248,000 |
Total Donor Contribution |
US$ 1,248,000 |
GOVERNMENT CONTRIBUTION (EC$)
Item |
Cost by Year |
|||
YEAR 2 |
YEAR 3 |
YEAR 4 |
Total |
|
Salaries of Counterparts |
40,000 |
20,000 |
20,000 |
80,000 |
Salaries of forestry staff assigned to Union Island |
30,000 |
30,000 |
30,000 |
90,000 |
Wages of workers |
10,000 |
20,000 |
20,000 |
50,000 |
Misc Expenses (transport to and from St. Vincent, etc) |
10,000 |
5,000 |
5,000 |
20,000 |
TOTAL EC$ |
90,000 |
75,000 |
75,000 |
240,000 |
US$ |
33,330 |
27,780 |
27,780 |
88,890 |
RECURRENT BUDGET IMPLICATIONS
Payment of salaries officers (12) assigned to Union Island Money to implement the plan particularly after year 4.
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
1.05 |
PRIORITY AREA: |
Land Use and Resources/Forestry in Land Use |
PROJECT TITLE: |
Agroforestry |
DURATION: |
Two (2) Years |
LOCATION: |
Ministry of Agriculture, Industry and Labour. St. Vincent and the Grenadines. |
BENEFICIARIES: |
Farmers |
BACKGROUND/PROBLEMS;
Agroforestry is very suitable to the physical and social economic environment of St. Vincent. There are, however, no plans or programmes for the systematic development of agroforestry.
GENERAL/SPECIFIC OBJECTIVES
General
To contribute to the development of technically suitable and economically viable Agroforestry systems.
Specific
(1) To develop suitable agroforestry models;
(2) To provide the profiles and economic assessment of the agroforestry models;
(3) To develop nursery facilities for the adequate supply of plants for the programme; and
(4) To provide technical guidance to farmers.
ACTIVITIES
i) Assessment of available data on farm size, tenure, current given activities, soils, markets and marketing;
ii) Modelling and economic assessment of models;
iii) Expansion and upgrading of nursery facilities; and
iv) Sourcing of suitable materials for propagation.
INPUTS
i) Resource personnel;
ii) Materials and labour for upgrading nursery facilities;
iii) Vehicles; and
iv) Credit for farmers to facilitate nursery activities.
OUTPUTS
i) Soil and watershed protection;
ii) Fruits and other commodities for export; and
iii) Increased agriculture production.
NATIONAL LEAD IMPLEMENTING AGENCY
Ministry of Agriculture, Industry and Labour.
CONDITIONS FOR SUCCESS/SPECIAL OBSERVATIONS
i) Adequate technical and advisory support services to farmers;
ii) Markets for the produce; and
iii) Credit to assist farmers overcome possible cash flow problems.
PROJECT BUDGET
(a) Donor Contribution |
US$ 180,000 |
(b) Government Contribution |
US$ 50,000 |
(c) Total Contribution |
US$ 230,000 |
|
Total Cost US $ |
i) Resource Personnel (3 man-months) |
30,000 |
ii) Ministry of Agriculture Staff |
50,000 |
iii) Nurseries including vehicle |
150,000 |
Total |
230,000 |
RECURRENT COST IMPLICATIONS
Not significant
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
1.06 |
PRIORITY AREA: |
Land Use and Resources/Forestry in Land Use |
PROJECT TITLE: |
Small Farm Irrigation Development |
DURATION: |
Two (2) Years |
LOCATION: |
Ministry of Agriculture, Industry and Labour. St. Vincent and the Grenadines |
BENEFICIARIES: |
Farmers |
BACKGROUND/PROBLEMS
Although irrigation is important for intensive vegetable production, very little irrigation is practised. Systems suitable for small farmers are needed to boost production for local consumption and export.
OBJECTIVES
General
To boost production of vegetables on irrigable lands.
Specific
i) To develop irrigation systems for small farms of St. Vincent.
ii) To implement an irrigation programme on selected farms and selected crops.
ACTIVITIES
i) Assessment of lands suitable for irrigation, water sources and supply;
ii) Selection of farms for irrigation development;
iii) Design of irrigation systems;
iv) Implementation on farms; and
v) Demonstration and farmer training.
INPUTS
i) Resource personnel;
ii) Ministry of Agriculture staff; and
iii) Line of credit for purchase of irrigation equipment.
OUTPUTS
i) Increased total production for local consumption and export; and
ii) Increased off-season (dry season) production.
NATIONAL LEAD IMPLEMENTING AGENCY
Ministry of Agriculture, Industry and Labour.
CONDITIONS FOR SUCCESS/SPECIAL OBSERVATIONS
Adequate technical and advisory support services
PROJECT BUDGET
(a) Donor Contribution |
US$ 150,000 mainly as line of credit |
(b) Government Contribution |
US$ 50,000 as staff inputs |
(c) Total Contribution |
US$ 200,000 |
RECURRENT COST IMPLICATIONS
Not significant
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
1.07 |
PRIORITY AREA: |
Land Use and Resources/Forestry in Land Use |
PROJECT TITLE: |
Assessment of Water Pollution by Agricultural Chemicals |
DURATION: |
One Year |
LOCATION: |
Central Water and Sewerage Authority, St. Vincent |
BENEFICIARIES: |
The people of St. Vincent |
BACKGROUND/PROBLEMS
The use of biocides in the water catchments above the water intakes has led to fear of pollution of the water supply. This has important health implications.
OBJECTIVES
General
To determine the extent of biocide pollution of the water supply.
Specific
i) To determine the amount and location of biocides used; and
ii) To determine the amount of biocides in the water supply in relation to agricultural activities.
ACTIVITIES
i) Survey of biocides usage; and
ii) water sampling at different times during the year in relation to rainfall amount and distribution, and farming activities.
INPUTS
i) Local staff inputs; and
ii) Laboratory analyses
OUTPUT
Determination of the health risks
NATIONAL LEAD IMPLEMENTING AGENCY
Central Water and Sewerage Authority
CONDITIONS FOR SUCCESS/SPECIAL OBSERVATIONS
Sufficient samples must be taken and sufficient analyses done to properly assess the situation.
PROJECT BUDGET
(a) Donor Contribution |
US$ 50,000 for chemical analyses |
(b) Government Contribution |
US$ 15,000 for sampling and transport |
(c) Total Contribution |
US$ 65,000 |
RECURRENT COST IMPLICATIONS
Not known
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
1.08 |
PRIORITY AREA: |
Land Use and Resources/Forestry in Land Use |
PROJECT TITLE: |
Land Tenure and Land Use Mapping and Land Zoning |
DURATION: |
One (1) Year |
LOCATION: |
Ministry of Agriculture, Industry and Labour, St. Vincent and the Grenadines |
BENEFICIARIES: |
Land users, Land Use Planners, Economic Planners, Land Developers. |
BACKGROUND/PROBLEMS
The current land use and land tenure are not accurately known. This is a handicap to proper land use planning and agricultural development. There is also need for land zoning to guide land use.
OBJECTIVES
General
To protect the watershed against poor and inappropriate use and deterioration.
Specific
i) To develop the information base for sustainable watershed development; and
ii) To develop a policy on land zoning and land use.
ACTIVITIES
i) Aerial photography and land use mapping;
ii) Examination of land tenure records and land titles to update the existing records; and
iii) Development of a land zoning policy.
INPUTS
Resource personnel
Aerial photograph
Ministry of Agriculture staff
Cartographer
OUTPUT
Land Use Information Base
NATIONAL LEAD IMPLEMENTING AGENCY
Ministry of Agriculture, Industry and Labour.
PROJECT BUDGET
To be determined.
RECURRENT COST IMPLICATION
To be determined.
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
2.01 |
PRIORITY AREA: |
Forest Based Industrial Development |
PROJECT TITLE: |
A Feasibility Study into the Development of Solar Drying of Wood |
DURATION: |
3 Weeks |
LOCATION: |
St. Vincent and the Grenadines |
BENEFICIARIES: |
Furniture Manufacturers, Joiners, Cabinet Makers, Carpenters, Handicraft Sector and the General Public. |
BACKGROUND
Most of the wood currently utilized for furniture manufacture, joinery, turnery and cabinet work is usually unseasoned (not kiln dried).
Inadequate wood drying is a major factor in preventing the manufacture of high quality wood products. Conventional kiln drying equipment comes in a wide range of makes. These employ different methods of drying, which require a high level of technical skills and the ability to operate efficiently.
Acquisition and operational costs are high. The capacity of these kilns is large and beyond the needs of St. Vincent and the Grenadines small manufacturers of wooden products.
It is being proposed to explore the advantage of introducing Solar Drying Technology in the form of 7m3 Jackrap solar kilns into the St. Vincent and the Grenadines private or technical educational system.
These kilns are low capital cost, low running cost for power and labour, require little skill to operate, are easy to construct and maintain; do not require continuous supervision and need very little maintenance.
IMMEDIATE OBJECTIVES
To assess and evaluate private sector receptivity to acquire and/or utilizing this level of drying technology.
To assess and evaluate technical vocational training institutions interest in training students in acquiring knowledge on wood seasoning technology.
To identify the most suitable location for this technology.
INPUTS
Consultant in Wood Technology (3 weeks).
OUTPUT
The submission of a report with recommendations as to feasibility of introducing Solar Drying Technology to St. Vincent and the Grenadines.
NATIONAL LEAD IMPLEMENTING AGENCY
Ministry of Agriculture
PROJECT COST
(a) Donor Contribution |
US$ 20,000 |
(b) Government Contribution |
EC$ 3,500 |
(c) Total Contribution |
US$ 21,300 |
i) Equipment and Infrastructure
Nil
ii) Personnel
One Wood Technologist with experience in Solar Drying Kilns.
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
2.02 |
PRIORITY AREA: |
Forest Based Industrial Development |
PROJECT TITLE: |
Establishment of Community Forestry Units |
DURATION: |
4 Years |
LOCATION: |
Sandy Bay/Owia/Overland/Fancy and Orange Hill area. Possibly Greggs/South Rivers and Park Hill. |
BENEFICIARIES: |
Rural communities located near the designated forestry units. |
BACKGROUND/PROBLEMS
Local timber and raw materials for the production of charcoal and craft are limited. There are established communities which depend on the production and sale of charcoal for their economic survival, but they do not own the land and other means of production. Unemployment in these areas is estimated at 70% which is above the national average. With proper organization of these communities, and the provision of the means of production and training, these communities will be able to produce charcoal and craft items for sale on a sustainable basis.
OBJECTIVES
General
To promote community involvement in the management and commercial production of forest resources in order to develop a positive attitude towards forest use.
Specific
i) To improve the socio-economic well-being of rural communities, thereby improving the national economy.
ii) To relieve unemployment by providing productive employment.
iii) To minimize urban migration.
iv) To develop skills in the management of small business.
ACTIVITIES
i) Select two rural communities as sites for forestry units.
ii) Prepare management plans.
iii) Involve communities in setting up cooperative management structure.
iv) Establish land lease agreement with government.
v) Develop financing and control mechanism.
INPUTS
Equipment
Farming and forestry tools
Nursery/planting materials
Access roads
Office space and equipment
Vehicles (2) Motor cycles (2)
Personnel
Project Director
2 Forestry Supervisors
2 Volunteer Foresters
OUTPUTS
Two land management units operated by rural communities to produce timber, charcoal, craft material and crops for community use, and sale on an economically and ecologically sustainable basis.
NATIONAL LEAD IMPLEMENTING AGENCY
The Forestry Division
CONDITIONS FOR SUCCESS/SPECIAL OBSERVATIONS:
The Government should be willing to make the land available. Community participation and joint leadership is also essential. Financing for the project and available markets for the products are most essential for success.
PROJECT BUDGET
(a) Donor Contribution |
US$ 402,500 |
(b) Government Contribution |
EC$ 272,000 (US$ 100,740) |
(c) Total Contribution |
US$ 503,240 |
DONOR CONTRIBUTION (US$)
Equipment |
YEAR 1 |
YEAR 2 |
YEAR 3 |
YEAR 4 |
TOTAL |
Tools |
2,000 |
1,000 |
1,000 |
1,000 |
5,000 |
Nursery |
5,000 |
1,000 |
1,000 |
1,000 |
8,000 |
Access Roads |
5,000 |
500 |
500 |
500 |
6,500 |
Vehicles (2) |
40,000 |
- |
- |
- |
40,000 |
Vehicle Operation |
14,000 |
15,000 |
15,000 |
15,000 |
59,000 |
Office |
30,000 |
- |
- |
- |
30,000 |
Construction Office |
12,000 |
12,000 |
12,000 |
12,000 |
48,000 |
Supplies Motor cycles (2) |
6,000 |
- |
- |
- |
6,000 |
Sub-total |
114,000 |
29,500 |
29,500 |
29,500 |
202,500 |
Personnel
Volunteer Foresters (2) |
50,000 |
50,000 |
50,000 |
50,000 |
- |
Sub-total |
50,000 |
50,000 |
50,000 |
50,000 |
200,000 |
Total |
164,000 |
79,500 |
79,000 |
79,500 |
402,500 |
Total Donor's Contribution |
US$ 402,500 |
GOVERNMENT CONTRIBUTION EC$
Personnel |
YEAR 1 |
YEAR 2 |
YEAR 3 |
YEAR 4 |
TOTAL |
Project Dir. (half-time) |
18,000 |
18,000 |
18,000 |
18,000 |
72,000 |
Forest Supervisor (2) |
50,000 |
50,000 |
50,000 |
50,000 |
200,000 |
Sub-total |
68,000 |
68,000 |
68,000 |
68,000 |
272,000 |
Total |
68,000 |
68,000 |
68,000 |
68,000 |
272,000 |
Total Government Contribution |
EC$ 272,000 (US$ 100,740) |
RECURRENT COST IMPLICATIONS
The communities should be viable, and able to absorb most of the operational costs after four years. The Forestry Division should monitor and provide extension services over the long term.
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
2.03 |
PRIORITY AREA: |
Forest Based Industrial Development |
PROJECT TITLE: |
Re-structuring the Craft Industry |
DURATION: |
2 years |
LOCATION: |
Nation-wide |
BENEFICIARIES: |
Individuals and communities involved in craft making. |
BACKGROUND/PROBLEMS
There is no information on the volume of craft material available on a sustained yield production basis. The craft industry lacks an organized structure at the community level and even more at the national level. The need exists for the diversification of the types of craft materials, and for additional skills to be acquired for the use of any new and improved types of craft material.
OBJECTIVES
General
To develop, structure and rationalize the craft industry by securing raw material supplies and upgrading skills.
Specific
i) To ensure that raw material for craft production will be available on a sustainable basis.
ii) To provide the necessary skill training for craft production.
iii) To ensure that the craft producers can make use of the economy of scale, and at the same time access new and additional marketing opportunities.
STRATEGIES
Strategies in support of the overall objectives will be as follows:
a. Working with the National Craft Council to develop it into an institution fully representing the interests of craft producers and providing them with technical assistance and other services.b. Development of strong links with the tourism industry nationally and regionally.
c. Development of products aimed at the hotel furnishing market with special emphasis on mats and bamboo products.
d. Introduction of new skills, e.g. ceramic and weaving, aimed at both the tourist and domestic markets.
e. Exhibitions of craft products locally and, in conjunction with the Department of Tourism, at conferences, conventions and trade fairs.
ACTIVITIES
i) National survey of crafts industry
ii) Assessment and regeneration of raw materials supplies
iii) Training courses in craft skills
iv) Establish community-based manufacturing and marketing systems.
INPUTS
Equipment
Office space & Equipment
Computer (l)
Vehicles (2)
Personnel
1 Craft export market specialist
1 Project Director (national)
4 Survey personnel (national)
2 Craft Trainers (national) 1 year
OUTPUTS
i) Base line for planning craft development
ii) Regeneration of raw material supplies
iii) Structured craft industry at community level with organized manufacturing and marketing systems
iv) Trained craftsmen
NATIONAL LEAD IMPLEMENTING AGENCY
Community Development Department of the Ministry of Housing, Local Government and Community Development in Collaboration with Tourism Department.
CONDITIONS FOR SUCCESS/SPECIAL OBSERVATION
This project has direct linkages with project 2.02 Establishment of Community Forestry Units. Therefore, there should be some cooperation and coordination in the implementation of both projects. Qualified and skilled individuals should carry out the survey, research and training, and the individuals of the communities must be committed to the project.
PROJECT BUDGET
(a) Donor Contribution |
US$ 354,000 |
(b) Government Contribution |
EC$ 266,000 (US$ 98,518) |
(c) Total Contribution |
US$ 452,518 |
DONOR CONTRIBUTION (US$)
Equipment |
YEAR 1 |
YEAR 2 |
SUBTOTAL |
Office space & equipment |
30,000 |
30,000 |
60,000 |
Computer |
5,000 |
- |
5,000 |
Small vehicles (2) |
25,000 |
- |
25,000 |
Vehicle operation |
12,000 |
12,000 |
24,000 |
Subtotal |
72,000 |
42,000 |
114,000 |
Personnel |
|
|
|
Craft Specialist |
120,000 |
120,000 |
- |
Subtotal |
120,000 |
120,000 |
240,000 |
Total |
192,000 |
162,000 |
354,000 |
Total Donor Contribution |
US$ 354,000 |
GOVERNMENT CONTRIBUTION (EC$)
Personnel |
YEAR 1 |
YEAR 2 |
SUBTOTAL |
Project Director (half time) |
18,000 |
18,000 |
36,000 |
Survey Personnel (2) |
50,000 |
50,000 |
100,000 |
Craft Trainers (2) |
65,000 |
65,000 |
130,000 |
Sub-total |
133,000 |
133,000 |
266,000 |
Total |
133,000 |
133,000 |
266,000 |
Total Government Contribution |
EC$ 266,000 (US$ 98,518) |
RECURRENT IMPLICATIONS
At the end of two years there may be training requirements so training may have to be provided periodically. Surveys should be done once every five years.
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
3.01 |
PRIORITY AREA: |
Fuelwood and Energy |
PROJECT TITLE: |
Development of a Biomass Energy Utilization Strategy |
DURATION: |
3 Years |
LOCATION: |
Nationwide |
BENEFICIARIES: |
Charcoal producers, fuelwood users and forest workers. |
BACKGROUND/PROBLEMS
Charcoal is widely used as a fuel with the estimated 1991 utilization of 23,060 m3 of wood. Fuelwood is excluded from this estimate, and annual consumption of wood for charcoal and fuelwood is expected to increase. The need exists to determine the projected demands for proper planning purposes.
OBJECTIVES
General
To develop, promote and implement a strategy for more efficient production and use of charcoal and fuelwood.
Specific
i) To provide information for sound planning
ii) To have organized marketing and production of charcoal and fuelwood
iii) To determine the environmental impact of the harvesting of wood for the production of charcoal and fuelwood
iv) To provide training in the most efficient ways of production and utilization of charcoal and fuelwood.
ACTIVITIES
i) Conduct a study of charcoal producers, users, and demand
ii) Develop charcoal producers association in model management areas
iii) Analyse resource base for fuelwood
iv) Assess resource base for fuelwood
v) Conduct field trials to evaluate the most efficient methods of charcoal production
vi) Prepare and present courses on improved charcoal production and incorporate in a programme of public awareness for producers and users
vii) Evaluate environmental impact of each option
viii) Establish a trial distribution and training programme for the use of stoves
ix) Develop long range strategies for production and use of fuelwood.
INPUTS
Equipment
Vehicle (1)
Office space, Equipment
Supplies
Charcoal kilns, stoves
Computer & Software
Personnel
Project Coordinator
Charcoal Specialist
Sociologist & Field Assistant
Energy Economist, 1 Instructor
Secretary, driver
OUTPUTS
i) Report on charcoal producers and users with demand projections
ii) Four/two charcoal producer organizations
iii) Fuelwood pricing analysis
iv) Assessment of resources base and sustainable fuelwood potential
v) Technical and economic evaluation of production methods
vi) Technical and social testing of various stove models
vii) Training in improved charcoal production
viii) Public awareness
ix) Environmental impact report on charcoal production and use
x) Preparation of long range strategy.
NATIONAL LEAD IMPLEMENTING AGENCY:
Forestry Division
CONDITIONS FOR SUCCESS/SPECIAL OBSERVATION
Linkage exists with the Establishment of Community Forestry Units Project (2.02), and implementation could begin after this project has commenced. This approach could save on funding for inputs.
PROJECT BUDGET
(a) Donor Contribution |
US$ 911,500 |
(b) Government Contribution |
EC$ 175,000 (US$ 64,815) |
(c) Total Contribution |
US$ 976,315 |
DONOR CONTRIBUTION (US$)
Equipment |
YEAR 1 |
YEAR 2 |
YEAR 3 |
SUBTOTAL |
Vehicle (1) |
20,000 |
- |
- |
20,000 |
Office space, equipment & supplies |
50,000 |
50,000 |
50,000 |
150,000 |
Stoves, kilns |
- |
50,000 |
- |
50,000 |
Vehicle operation |
15,000 |
15,000 |
15,000 |
45,000 |
Computer & Software |
15,000 |
- |
- |
15,000 |
Sub-total |
100,000 |
115,000 |
65,000 |
280,000 |
Personnel |
YEAR 1 |
YEAR 2 |
YEAR 3 |
SUBTOTAL |
Project Coordinator |
120,000 |
120,000 |
120,000 |
360,000 |
Charcoal Specialist |
60,000 |
60,000 |
- |
20,000 |
Sociologist |
15,000 |
15,000 |
15,000 |
45,000 |
Forest Supervisor/Field Assistant |
12,500 |
12,500 |
12,500 |
37,500 |
Energy Economist |
18,000 |
18,000 |
18,000 |
54,000 |
Instructor |
5,000 |
5,000 |
5,000 |
5,000 |
Sub-total |
230,000 |
230,000 |
170,000 |
631,500 |
Total Donor Contribution |
US$ 911,500 |
GOVERNMENT CONTRIBUTION (EC$)
Equipment |
YEAR 1 |
YEAR 2 |
YEAR 3 |
SUBTOTAL |
Field Office |
100,000 |
- |
- |
100,000 |
Sub-total |
100,000 |
- |
- |
100,000 |
Personnel |
|
|
|
|
Secretary |
15,000 |
15,000 |
15,000 |
45,000 |
Driver |
10,000 |
10,000 |
10,000 |
30,000 |
Sub-total |
25,000 |
25,000 |
25,000 |
75,000 |
Total |
125,000 |
25,000 |
25,000 |
175,000 |
Total Government Contribution |
EC$ 175,000 (US$ 64,815) |
RECURRENT COST IMPLICATIONS
The government should provide extension and monitoring facilities after planning long term strategy.
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
4.01 |
PRIORITY AREA: |
Conservation of Tropical Forest Ecosystems |
PROJECT TITLE: |
Tobago Cays National Park |
DESCRIPTION
The Tobago Cays project comprises a number of small sub-projects, which could be presented for total funding as a package, or alternatively be presented separately to different aid donors.
(a) Parks Office, Union Island EC$ 50,000
The project would involve remodelling and expanding the Tourist Information office to provide space for the Park Administration Office and Small Interpretation Centre.
(b) Park Administration Patrol Boat EC$ 45,000
A 45 feet parol boat, with 4 sleeping bunks to be purchased for monitoring and enforcement at the park. Sleeping accommodation would allow park staff to overnight at the Cays when necessary. The boat could only be obtained at this cost if it is acquired through the Pan American Development Foundation (PADF) programme, or similar arrangement. Otherwise, the cost would be about EC$ 160,000.
(c) Dinghy Moorings. Horse Shoe Reef EC$ 9,000
Twelve (12) permanent dinghy moorings are to be placed at Horse Shoe Reef to minimize damage to corals from dinghy anchors. Yachtsmen will be asked to use the permanent moorings when making snorkel trips to the reef.
(d) Yacht Moorings. Main Anchorage. Tobago Cays EC$ 50,000
Fifty permanent yacht moorings are to be constructed and placed at Tobago Cays anchorages to prevent visiting yachts from dropping anchors. Continuous dropping of anchors destabilizes the seabed and suspends sediments in the water column, both of which may result in degraded water quality.
(e) Trail Development. Baradel and Petit Bateau EC$ 15,000
This project would improve existing trails on Baradel island and develop a trail system on Petit Bateau island. Trails will be improved or developed to provide the best possible observation of plants and wildlife and to minimize damage to ecologically sensitive areas.
(f) Research/Tourism facility. Mayreau EC$ 36,900
This project would seek to construct and run a private research facility on Mayreau, catering for university student groups and special tourist groups, who could be encouraged to mix vocation with well planned research and nature exploitation activities, aimed at improving their understanding of marine or terrestrial biology. Though private, the research facility would have a cooperative and mutually beneficial relationship with the Parks and Recreation Commission.
(g) Natural Guidebook. Tobago Cays and Beaches of the Grenadines EC$ 40,500
This section of the natural guidebook on Tobago Cays would combine photographs, illustrations and text to explain key natural marine and terrestrial resources of the proposed park. It will promote the recreational features of the park, while attempting to make visitors aware of sensitive environmental resource use issues. The section on beaches would be mainly a photographic summary highlighting quality and recreational attractions.
(h) Interpretation & Display Material and Hand-outs EC$ 20,000
The material would include photographs, slides. brochure and leaflets. Photographs and slides would be used at the park office's interpretation centre. Copies of the brochure and leaflets to be distributed appropriately.
TOBAGO CAYS NATIONAL PARK PROJECT
Follow-up Surveys and Studies
The following surveys or studies would be required for the park to; (1) obtain more reliable data on its resources; (2) determine resource management priorities and; (3) help provide guidelines for long-term recreational uses; (4) provide information for preparing the natural guidebook, brochure and leaflets.
Reef Survey. Horse Shoe Reef: To determine main sources of reef degradation and to provide recommendations for immediate and long-term action. 6 man-months (mm), using two persons, including a local technician. |
EC$ 105,000 |
|
|
Bird Survey of Tobago Cays and Other Selected Small Cays: |
|
|
|
To determine nesting and habitat patterns and to recommend short and long-term protective measures. 1 mm |
EC$ 21,000 |
|
|
Vegetation Survey of Tobago Cays: To investigate and map areas of natural vegetation and to make recommendations on landscape improvements. 1 mm. |
EC$ 21,000 |
|
|
Park Management Plan: To formulate policies, strategies and long-term actions for managing the Tobago Cays National Park. 3 mm. |
EC$ 65,600 |
|
|
TOTAL COST |
EC$ 500,000 |
|
US$ 185,000 |
Source: Ivor Jackson, Thomas Rigert, D. Parr is, Nora L. Berwick & Gay law A. Ramussen, ACTION PLAN FOR TOURISM DEVELOPMENT IN THE GRENADINES. 1987 - 1992. OAS, Oct. 1968.
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
4.02 |
PRIORITY AREA: |
Conservation of Tropical Ecosystems |
PROJECT TITLE: |
Development of a Wildlife Unit |
DURATION: |
2 Years |
LOCATION: |
Ministry of Agriculture, Forestry Division |
BENEFICIARIES: |
General |
BACKGROUND/PROBLEMS
Capability for wildlife assessment is curtailed by a lack of a wildlife biologist and research and monitoring equipment.
OBJECTIVES
General
To increase assessment and conservation of wildlife resources of St. Vincent and the Grenadines.
Specific
To develop capability within the Forestry Division to conduct wildlife surveys, develop 5 year action plan and develop baseline information system.
ACTIVITIES
(1) Assessment of wildlife in all conservation areas
(2) Determination of status of wildlife species, particularly birds
(3) Conducting surveys of Amazona quildingii
INPUTS
Equipment: |
Field gear, vehicle |
Personnel: |
Wildlife Biologist, Forest Guards (2) |
NATIONAL LEAD IMPLEMENTING AGENCY
Forestry Division
PROJECT BUDGET
(a) |
Donor Contribution |
EC$ 252,000 (US$) |
(b) |
Government Contribution |
EC$ 30,000 |
(c) |
Total Contribution |
US$ |
DONOR CONTRIBUTION (EC$)
|
YEAR 1 |
YEAR 2 |
YEAR 3 |
Vehicle (4-W-D) |
10,000 |
|
|
Trail bikes |
3,000 |
|
|
Field gear |
8,000 |
|
|
Computer |
3,000 |
|
|
GIS |
8,000 |
|
|
Office supplies |
2,000 |
|
|
Maintenance |
4,000 |
4,000 |
4,000 |
Operations/Surveys |
20,000 |
15,000 |
15,000 |
Sub-total |
96,000 |
|
|
Personnel |
|
|
|
Biologist |
30,000 |
32,000 |
34,000 |
Forest Guards |
20,000 |
20,000 |
20,000 |
Sub-total |
156,000 |
|
|
Total Donor Contribution |
EC$ 252,000 |
GOVERNMENT CONTRIBUTION (EC$)
Office space/utilities |
10,000 |
10,000 |
10,000 |
Total |
30,000 |
|
|
Total Government Contribution |
EC$ 30,000 |
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
4.03 |
PRIORITY AREA: |
Conservation of Tropical Ecosystems |
PROJECT TITLE: |
Expansion of Amazona quildingii Captive Breeding Programme |
DURATION: |
2 Years |
LOCATION: |
Camden Park, St. Vincent |
BENEFICIARIES: |
General |
BACKGROUND/PROBLEMS
Present facilities at the Botanic Gardens, Kingstown are inadequate for increases in success of captive breeding. Cognizant of the need to improve the genetic viability (deter inbreeding), it becomes necessary to expand numbers of breeding pairs and improve the housing facility of the aviary.
OBJECTIVES
General
Conservation of the endangered parrot, Amazona quildingii
Specific
(a) Improve breeding techniques
(b) Study diseases, food and diet
ACTIVITIES
(a) Facilitate mating by identification of breeding pairs from within the stock of 28 individuals
(b) Construction of cages
(c) Construction of research and feeding facility
INPUTS
Equipment: |
- Office supplies, kitchen facilities and equipment |
Personnel: |
- Wildlife Veterinarian |
|
- Wildlife Officer |
|
- Watchman |
NATIONAL LEAD IMPLEMENTING AGENCY
Forestry Division
PROJECT BUDGET
(a) Donor contribution |
EC$ 90,000 (US$ 33,333) |
(b) Government contribution |
EC$ 28,000 |
(c) Total Contribution |
US$ 43,650 |
DONOR CONTRIBUTION (EC$)
|
YEAR 1 |
YEAR 2 |
Hardware supplies |
50,000 |
|
Lab supplies |
2,000 |
1,000 |
Kitchen equipment |
2,000 |
|
Sub-total |
55,000 |
|
Personnel |
|
|
Veterinarian |
20,000 |
|
Labour |
15,000 |
|
Sub-total |
35,000 |
|
Total Donor Contribution |
EC$ 90,000 |
GOVERNMENT CONTRIBUTION (EC$)
Wildlife Officer |
8,000 |
8,000 |
Watchman |
1,000 |
1,000 |
Land |
10,000 |
|
Total |
28,000 |
|
Total Government Contribution |
EC$ 28,000 |
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
5.01 |
PRIORITY AREA: |
Institutions |
PROJECT TITLE: |
Forestry Development: Phase II |
DURATION: |
Five Year Beginning in Year (1994) |
LOCATION: |
Forestry Head Office, Campden Park, St. Vincent. |
BENEFICIARIES: |
i) Forestry Division of St. Vincent and the Grenadines |
ii) Citizens of St. Vincent and the Grenadines through the benefits of better managed forest resources. |
|
iii) Persons involved in forest and agroforestry management, ecotourism activities and other forest and forest resources and user groups. |
BACKGROUND
The on-going five year St. Vincent and the Grenadines/CIDA Forestry Development Project which started on April 1, 1989 is due for completion on March, 31, 1994. The Project Goal is "to develop the institutional capacity of the St. Vincent Forestry Division to manage and protect the country's forest resources and to create an awareness with Vincentians that they can reverse the trend of environmental degradation while providing for their forest needs." The implementation strategy is the integration of social forestry in the management of the country's watershed by:
i) Conserving the natural forest to regulate waterflows and preserve wildlife habitat and unique biological ecosystems in the upper watersheds;ii) Establishing the natural forests to regulate waterflows and preserve wildlife habitat and unique biological ecosystems in the upper watersheds;
iii) Practising intensive management of plantation forests around water catchment areas within the agricultural and settled parts of the watersheds, for the protection of potable water supplies and timber production.
Work programmes were developed in five activity areas. viz
i) Policy Development;
ii) Organization and Staff Development;
iii) Conservation of Natural Resources;
iv) Development of Plantation Forests; and
v) Project Management and Administration
Each Priority Activity area was sub-divided into two or more sub-activities. These are summarised in Appendix I.
While all the targets of the project are expected to be completed by the end of the project (except for one student (BScF) who is expected to complete his studies in June 1994) due to the overlap of training with other aspects of project execution. the Forestry Division could not fully benefit from the transfer of technology.
In addition, due to the long-term requirements for most silvicultural research activities, the results of such research are not ready for general field application.
Some aspects of integrated forest management were not included to any appreciable extent in the project. These aspects include wildlife research and management (other than the St. Vincent parrot work), and national park establishment, planning and management. While management plans (overall Forest Resource Conservation Plan, 10 year Plantation Management Programme, Colonarie Model Watershed Management Plan) will be prepared, there will be insufficient time to implement the plans and to make modifications based on field experience gained especially in the initial planning period. There will also not be sufficient time to test the Division's capability to do follow-up management plans e.g for other important water catchment areas, for individual forest reserves and for national parks and wildlife reserves.
Based on these circumstances, a second (Phase II) Forestry Development Project is necessary to further develop the institutional capability of the St. Vincent and the Grenadines Forestry Division.
OBJECTIVES
General
To further develop the institutional capacity of the St. Vincent and the Grenadines Forestry Division to manage the country's forest resources.
Specific
i) To provide additional staff training, particularly in areas not adequately covered by the 1989-1994 Forestry Development Project.
ii) To provide technical support to the Forestry Division.
iii) To provide additional transport vehicles and field and office equipment.
iv) To develop, execute and monitor management plans for national parks, wildlife and reserves, important watersheds, forest reserves and the like.
v) To evaluate and apply (where possible) research findings.
ACTIVITIES
i) Provision of equipment, 4-wheel drive vehicles and supplies
ii) Drawing up and implementing of a staff training programme
iii) Provision of a Chief Technical Advisor and other consultants
iv) Constructing two work stations/rest houses in the Grenadines (perhaps on Bequia and Union Island)
v) Preparing and implementing work programmes, management plans, project reports and the like
vi) Evaluating research findings, management plan implementation and the like, preparing relevant manuals, adjusting research to meet needs, and undertaking plan revisions
INPUTS
Equipment/Infrastructure
Field Equipment
Two (2) four-wheel drive vehicles
Computers and other office equipment
Two (2) work stations/Rest Houses for the Grenadines
Personnel
Chief Technical Advisor
1 National Parks Planner
1 Wildlife Researcher/Manager
1 Watershed management specialist
1 Forest Management
Specialist
Counterpart Officer
Several Trainees (nationals)
Several short term consultants depending on needs to be identified.
OUTPUTS
i) Better trained staff
ii) Better transport for field work
iii) Accommodation for the Division in two of the Grenadines
iv) Improved capability of the Forestry Division to perform its role and function
v) Reports, management and other plans, manuals and other operational documents
vi) Better managed forests and plantations
vii) Approved policies and legislation in National Parks.
NATIONAL LEAD IMPLEMENTING AGENCY
Forestry Division, Ministry of Agriculture, Industry and Labour.
CONDITIONS FOR SUCCESS/SPECIAL OBSERVATIONS
i) The availability of sufficient Grant Funding.
ii) The setting up of a Project Coordinating/Steering Committee.
iii) The availability of officers as counterparts and officers/new recruits for training.
iv) This project should be in place on January 1, 1994 so that a smooth link up/hand over can be made with the existing Forestry Development Project.
v) The project can be the base for the SVG Country Capacity Project.
PROJECT BUDGET
(a) Donor Contribution |
US$ 6,070,000 |
(b) Government Contribution |
US$ 1,111,120 (EC$ 3,000,000) |
(c) Total Contribution |
US$ 7,181,120 |
DONOR CONTRIBUTION (US$)
i) Equipment/Infrastructure |
Cost by Year |
|||||||
Item |
1 |
2 |
3 |
4 |
5 |
Total |
||
Field Equipment |
10,000 |
10,000 |
5,000 |
2,500 |
2,500 |
30,000 |
||
Two (2) four-wheel drive vehicles |
40,000 |
- |
- |
- |
- |
40,000 |
||
Computers and other office equipment and expenses |
20,000 |
20,000 |
10,000 |
10,000 |
10.000 |
70,000 |
||
Construction of two (2) work stations/rest houses for the Grenadines |
50,000 |
50,000 |
- |
- |
- |
100,000 |
||
Miscellaneous items (allow) |
10,00 |
10,000 |
10,000 |
10,000 |
10,000 |
50,000 |
||
Sub-total |
130,000 |
90,000 |
25,000 |
22,500 |
22,500 |
290,000 |
||
ii) Personnel |
|
|
|
|
|
|
||
|
1 Chief Technical Advisor |
100,000 |
100,000 |
100,000 |
100,000 |
100,000 |
500,000 |
|
|
1 National Parks Planner |
80,000 |
80,000 |
80,000 |
80,000 |
80,000 |
400,000 |
|
|
1 Wildlife Researcher/Manager |
80,000 |
80,000 |
80,000 |
80,000 |
80,000 |
400,000 |
|
|
1 Watershed Management Specialist |
80,000 |
80,000 |
80,000 |
80,000 |
80,000 |
400,000 |
|
|
1 SiIviculturalist |
80,000 |
80,000 |
80,000 |
80,000 |
80,000 |
400,000 |
|
|
1 Forest Management Specialist |
80,000 |
80,000 |
80,000 |
80,000 |
80,000 |
400,000 |
|
|
Consultancies (equivalent to 5 person yrs) |
|
160,000 |
80,000 |
80,000 |
80,000 |
400,000 |
|
|
Sub-total |
500,000 |
660,000 |
580,000 |
580,000 |
280,000 |
2,900,000 |
|
iii) Other |
|
|
|
|
|
|
||
|
Misc payments to/on behalf of Experts |
250,000 |
200,000 |
200,000 |
200.000 |
250,000 |
1,100,000 |
|
|
Training costs: |
|
|
|
|
|
|
|
|
|
(a) Overseas |
25,000 |
125,000 |
150,000 |
150,000 |
50,000 |
500,000 |
|
|
(b) Local and Regional |
130,000 |
150,000 |
150,000 |
150,000 |
120,000 |
700,000 |
|
Administrative expenses, printing of reports, purchases of stationery, maintenance of vehicles, etc |
80,000 |
120,000 |
120.000 |
130,000 |
130,000 |
589,000 |
|
|
Sub-total |
485,000 |
595,000 |
620,000 |
630,000 |
550.000 |
2,880.000 |
|
GRAND TOTAL |
1,115,000 |
1,345,000 |
1,305,000 |
1,232.500 |
1,072,500 |
6,070,000 |
GOVERNMENT CONTRIBUTION (EC$)
Item |
Cost by Year |
|||||
1 |
2 |
3 |
4 |
5 |
Total |
|
Payment of salaries of Scholars (Forest Officers et al) and overseas/regional training |
200,000 |
300,000 |
400,000 |
400,000 |
200,000 |
1,500,000 |
Payment of salaries of Counterpart staff |
140,000 |
140,000 |
140,000 |
140,000 |
140,000 |
700,000 |
Payment of wages of workers |
100,000 |
100,000 |
100,000 |
100,000 |
100,000 |
500,000 |
Maintenance of vehicles (existing) used in project |
40,000 |
40,000 |
40,000 |
40,000 |
40,000 |
200,000 |
Misc Expenses |
10,000 |
10,000 |
10,000 |
10,000 |
10,000 |
50,000 |
Total EC$ |
490,000 |
640,000 |
690,000 |
690,000 |
490,000 |
3,000,000 |
US$ |
181,480 |
237,040 |
255,560 |
255,560 |
181,480 |
1,111,120 |
RECURRENT BUDGET IMPLICATIONS
i) Contribution of the payment of salaries of monthly paid counterpart staff. This is not an additional cost since such counterparts are on the normal monthly payroll of the Forestry Division.
ii) Maintenance of the two vehicles purchase under this project.
iii) Contribution of the payment of the wages to workers who will continue working on management projects emanating from the Forestry Development Project.
ST. VINCENT AND THE GRENADINES
NATIONAL FORESTRY ACTION PLAN
PROJECT PROFILE
PROJECT NUMBER: |
5.02 |
PRIORITY AREA: |
Institutions |
PROJECT TITLE: |
Strengthening Environmental Education Agencies in St. Vincent and the Grenadines |
DURATION: |
5 Years |
LOCATION: |
Kingstown |
BENEFICIARIES: |
Ministry of Education, Youth and Women |
BACKGROUND/PROBLEMS
Public education on environmental issues has received support from local and international organizations. The various government and non-governmental agencies need further support in the form of additional equipment. training materials, skill training and technical assistance. The CIDA Forestry Development Project has a Public Education/Awareness component but this project is due to be completed by 1994. Environmental Education must be viewed as a long-term programme. Therefore. preparation must be made for the continuation of this programme after the CIDA Project.
OBJECTIVES
General
To strengthen and upgrade the capability of environmental education agencies for delivering the environmental education messages to schools, and the general public at large.
Specific
i) To make possible the preparation of environmental messages for delivery to the general public.
ii) To document environmental education information for research, and the provision of knowledge and information for research and for posterity.
iii) To emphasize environmental education as a major element in national and human development.
iv) To complement in-service training programmes for primary school teachers.
ACTIVITIES
i) Review previous and present status of environmental education programmes and proposals.
ii) Develop a system to monitor public education geared to key population segments.
iii) Develop methodology to evaluate effectiveness of environmental education programmes.
iv) Develop a mobile information centre
v) Provision of technical assistance personnel to train equipment operators, material/information production personnel. and other relevant officers in both government and non-governmental agencies.
vi) Organization of seminars for professional communicators, scientists and resource managers.
vii) Provision of equipment and supplies.
viii) Design and disseminate information materials for use in print and electronic format in protected areas, schools and mass media.
ix) Routine application of effectiveness evaluation to all programmes.
INPUTS
Equipment
4-WD Vehicle (2)
Book mobile (1)
Electronic scanner (2)
Printing Computer,
Photocopier
Environmental Bus, VCR
Recorders and Monitors
Office space, equipment & supplies
Hi-8 Cameras/Super VHS
Video:
Cassettes, Projectors
Personnel
Communications specialist (1)
Communications equipment
Technician (1)
Secretaries (2)
OUTPUTS
i) Revised environmental policies and programmes
ii) Awareness monitoring system
iii) Multi media environmental education packages
iv) Fully equipped bookmobile and environmental bus
v) Prepared curriculum module for teacher colleges and for general public
vi) Strengthened Resources Centre of the Ministry of Education, Youth and Women Affairs, for the improvement of the environmental education and social studies programme.
NATIONAL LEAD IMPLEMENTING AGENCY
Ministry of Health and the Environment in collaboration with Ministry of Education, National Library Services, the Forestry Division and NGOs.
CONDITIONS FOR SUCCESS/SPECIAL OBSERVATIONS
There should be proper coordination among all the agencies involved in environmental education. Materials produced should be properly stored in computers/computer disc and other forms of documentation for use by future generations. This project should incorporate all existing activities being implemented in environmental education.
PROJECT BUDGET
(a) Donor Contribution |
US$ 1,280,00 |
(b) Government Contribution |
EC$ 446,000 (US$ 165,185) |
(c) Total Contribution |
US$ 1,445,185 |
DONOR CONTRIBUTION (US$)
Equipment |
YEAR 1 |
YEAR 2 |
YEAR 3 |
YEAR 4 |
YEAR 5 |
SUBTOTAL |
4-WD Vehicle (2) |
50,000 |
10,000 |
10,000 |
10,000 |
10,000 |
90,000 |
Book mobile (1) |
40,000 |
- |
- |
- |
- |
40,000 |
Environmental bus (1) |
40,000 |
- |
- |
- |
- |
40,000 |
Computer and Printer |
15,000 |
- |
- |
- |
- |
15,000 |
Other equipment |
35,000 |
25,000 |
5,000 |
- |
- |
65,000 |
Supplies |
10,000 |
10,000 |
10,000 |
10,000 |
10,000 |
50,000 |
Sub-total |
190,000 |
45,000 |
25,000 |
20,000 |
20,000 |
300,000 |
|
YEAR 1 |
YEAR 2 |
YEAR 3 |
YEAR 4 |
YEAR 5 |
SUBTOTAL |
Personnel |
|
|
|
|
|
|
Communication Specialist |
48,000 |
54,000 |
60,000 |
66,000 |
72,000 |
300,000 |
Technician |
30,000 |
35,000 |
40,000 |
45,000 |
50,000 |
200,000 |
Secretaries (2) |
24,000 |
30,000 |
36,000 |
42,000 |
48,000 |
180,000 |
Sub-total |
102,000 |
119,000 |
136,000 |
153,000 |
170,000 |
680,000 |
Other |
|
|
|
|
|
|
Booklets, pamphlets Magazines, TV slots Seminars, workshop Evaluation etc |
|
|
|
|
|
|
Estimated |
60,000 |
60,000 |
60,000 |
60,000 |
60,000 |
300,000 |
Sub-total |
60,000 |
60,000 |
60,000 |
60,000 |
60,000 |
300,000 |
TOTAL |
352,000 |
224,000 |
221,000 |
233,000 |
250,000 |
1,280,000 |
Total Donor Contribution |
US$ 1,280,000 |
GOVERNMENT CONTRIBUTION (EC$)
|
YEAR 1 |
YEAR 2 |
YEAR 3 |
YEAR 4 |
YEAR 5 |
SUBTOTAL |
Equipment |
|
|
|
|
|
|
Office space |
6,000 |
6,000 |
6,000 |
6,000 |
6,000 |
30,000 |
Vehicle operation |
25,000 |
25,000 |
30,000 |
36,000 |
50,000 |
166,000 |
Sub-total |
31,000 |
31,000 |
36,000 |
42,000 |
56,000 |
196,000 |
Personnel |
|
|
|
|
|
|
Counterparts |
38,000 |
38,000 |
38,000 |
38,000 |
38,000 |
190,000 |
Technician |
12,000 |
12,000 |
12,000 |
12,000 |
12,000 |
60,000 |
Sub-total |
50,000 |
50,000 |
50,000 |
50,000 |
50,000 |
250,000 |
TOTAL |
81,000 |
81,000 |
86,000 |
92,000 |
106,000 |
446,000 |
Total Government Contribution |
EC$ 446,000 (US$ 165,185) |
RECURRENT COST IMPLICATIONS
Public education is an ongoing process and therefore the activities of the project should be divested to the beneficiary agencies at the end of the project.