Previous Page Table of Contents Next Page


Project 2.0 - Forest and Watershed Rehabilitation with a Sustained Utilization Component

(Consolidation of Projects 2.1, 2.2, 2.3)

PRIORITY AREAS

Forestry in Land Use/Industries/Fuelwood

DURATION

5.0 years

LOCATION

Body Ponds, Dunnings, Christian Valley, Bethesda, Monks Hill, John Hughes Liberta/Swetes/Wallings, Falmouth/English Harbour, Dunbars, Pot Works Dam perimeter, Palmetto Point (Barbuda).

TARGET BENEFICIARIES

Watershed Inhabitants, Land Owners, Domestic Water Consumers, Charcoal Producers, Tourists, Farmers.

IMMEDIATE OBJECTIVES

1. To establish tree cover on degraded watershed and sand-mined lands in order to reduce erosion, improve water retention and enhance rural development, through agroforestry conservation practices.

2. To study the potential for utilizing neem to produce insecticides and fertilizers for local and foreign markets.

3. To determine the current production capability for charcoal and to investigate the possibility for increasing output and demand.

ACTIVITIES

1. Prepare comprehensive Land Use Plan based on the physical assessment of available sites.

2. Assess existing tree cover, orchards, livestock herds, and investigate potential yields and markets, and returns.

3. Institute fire protection, livestock integration/control and forest extraction control procedures.

4. Establish trial plots of selected tree species (neem, etc.).

5. Obtain financing and commence implementation of seedling production, reforestation, watershed management, agroforestry measures including a maintenance programme.

6. Organize field training for farmers, workers, and communities.

7. Update data base on rural sociology and prepare land allocation plan for farmers/settlers.

8. Evaluate work plan results and prepare reports.

9. Upgrade seed collection and nursery production with a maintenance component.

10. Review technology and applications of neem and prepare a feasibility study for its plantation, harvesting and marketing.

11. Conduct a survey of all charcoal burners and their productivity; demonstrate an improved kiln design.

12. Assess opportunities for linkages with tourism and environmental concerns.

NATIONAL LEAD IMPLEMENTING AGENCY

Ministry of Agriculture, Forestry Unit in collaboration with the Barbuda Council, Antigua Public Utilities Authority, NGO's.

LINKAGES WITH OTHER PROJECTS:

NFAP project 1.0

OBSERVATIONS;

High priority project with the opportunity for use of reassigned casual employees from various Ministries.

OUTPUTS

1. Optimal Land Utilization Plan covering Government properties, private lands, infrastructure and services.

2. Promotion and encouragement of agroforestry opportunities.

3. 250 ha of reforested lands.

4. 500 farmers trained in agroforestry techniques.

5. Control of bush fires and roaming livestock.

6. Update data base for rural development.

7. Data on species and programme performance.

8. Protected soil and water resources and improved water and agricultural yields.

9. Assessment of the industrial potential to produce neem tree products.

10. Assessment of fuel wood feasibility with the alternative energy potential.

INPUTS

Equipment and Materials



4 w.d. Station wagon (1)

4 w.d. Pick-up (1)

Survey instruments

Aerial photography, maps

Seeds, fencing

Tools, radios

Planting materials

Chain saw, axes, wedges

Kiln and scale


Personnel



Project Manager/Forestry Expert

Forestry Assistant

Soil conservation specialist

Livestock Officer

Extension Officer

Secretary

Foreman/Field Assistant (2)

Wood energy expert

Neem utilization expert

Field Assistant

PROJECT BUDGET

Table 12. Personnel with Cost Requirements 3

PERSONNEL

MAN MONTHS

FOREIGN COSTS
(US $$)

LOCAL COSTS
(EC $$)

Project Manager

60

500,000.00


Soil Conservation Specialist

36

270,000.00


Forestry Assistant

60


90,000.00

Livestock Officer

60


125,000.00

Extension Officer

60


125,000.00

Foreman/Field Assistants

66


82,000.00

Secretary

60


80,000.00

Wood Utilization Expert

12

100,000.00


Neem Utilization Expert

6

45,000.00


SUB-TOTAL


915.000.00

502.000.00

3 Project 2 with priority 2 rating.

Table 13. Equipment with Cost Requirements

EQUIPMENT

FOREIGN COSTS
(US $$)

4 w.d. vehicles (2)

50,000.00

Tools/instruments, saw

60,000.00

Radios (2)

2,000.00

Planting material

25,000.00

Fencing

25,000.30

Field trials

10,000.00

SUB-TOTAL

172,000.00

Table 14. Practical Aspects with Associated Costs

PRACTICAL ASPECTS

FOREIGN COSTS
(US $$)

LOCAL COSTS
(EC $$)

Operating expenses


16,000.00

Field operations


500,000.00

Training

15,000.00


SUB-TOTAL

15,000.00

516,000.00

Table 15. Total Budget Requirement

BUDGET ITEM

FOREIGN COSTS
(US $$)

LOCAL COSTS
(EC S$)

EQUIPMENT

172,000.00


PRACTICAL ASPECTS

15,000.00

516,000.00

PERSONNEL

915,000.00

502,000.00

TOTAL BUDGET

1,102,000.00

1,018,000.00


Previous Page Top of Page Next Page