ANNEX A
DETAILS OF THE PLANNED RESEARCH PROJECTS (Contd.)

PROJECT TITLE:Shrimp farm designCODE: N-08
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Culture programme 
   
RESEARCH AREA(S): CODE(S):
- Brackishwater production management02-01/02-02
- Socio-economics 14–01

OBJECTIVES:

  1. development of designs for small farms for semi-intensive and intensive culture of Macrobrachium and P. monodon;
  2. studies of the economic and social viability of small-scale semi-intensive and intensive shrimp farming.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.08.1988   
- DATE OF COMPLETION:31.07.1991   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF: 222
    
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:400,000   
- CAPITAL EXPENSES:500,000   
- TOTAL:900,000   

PROJECT TITLE:Brackishwater pen and cage cultureCODE: N-09
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Culture programme 
   
RESEARCH AREA(S): CODE(S):
- Brackishwater production management02-01/02-02
- Cage/pen production management03–04

OBJECTIVES:

  1. identification of suitable species for brackishwater pen and/or cage culture;
  2. testing of brackishwater pen and cage culture systems in practice;
  3. demonstration of research results.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.08.1988   
- DATE OF COMPLETION:31.07.1991   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
 
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:450,000   
- CAPITAL EXPENSES:100,000   
- TOTAL:550,000   

PROJECT TITLE:Crocodile farmingCODE: N-10
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Culture programme 
   
RESEARCH AREA(S): CODE(S):
- Brackishwater production management02–03

OBJECTIVES:

  1. determination of the feasibility of farming of Crocodilus porosus in Bangladesh;
  2. development of a pilot scale crocodile farming system.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.08.1988   
- DATE OF COMPLETION:31.07.1991   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF: 333
     
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:750,000   
- CAPITAL EXPENSES:750,000   
- TOTAL:1,500,000   

PROJECT TITLE:Assessment of shrimp seed resources of BangladeshCODE: O-01
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Resources programme 
   
RESEARCH AREA(S): CODE(S):
- Brackishwater production management02–04
- Reproduction marine and brackishwater species08-01/08-02
- Socio-economics 14-08

OBJECTIVES:

  1. identification of the spawing grounds and seed collection centres for Macrobrachium and P. monodon, in different rivers;
  2. estimate of the abundance of seed stock of different species of penaeid shrimp and Macrobrachium, from natural sources;
  3. study of the influence of physico-chemical and hydro-dynamic parameters on the abundance of seed.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 333
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:600,000   
- CAPITAL EXPENSES:100,000   
- TOTAL:700,000   

PROJECT TITLE:Gear for collection of shrimp seedCODE: O-02
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Resources programme 
   
RESEARCH AREA(S): CODE(S):
- Reproduction marine and brackishwater species08-05
- Socio-economics 14-04

OBJECTIVES:

  1. development of gear for collection of shrimp seed from natural resources;
  2. testing of the efficacy of gear developed under different environmental conditions;
  3. comparison of the catch per unit effort of the gear developed and of the gear presently used;
  4. popularization of the use of newly developed gear among shrimp seed collectors.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.08.1988   
- DATE OF COMPLETION:31.07.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 33-
     
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:400,000   
- CAPITAL EXPENSES:75,000   
- TOTAL:475,000   

PROJECT TITLE:Limnology of brackishwater pondsCODE: O-03
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Resources programme 
   
RESEARCH AREA(S): CODE(S):
- Brackishwater production management02–05

OBJECTIVES:

  1. study of different physico-chemical and biological characteristics of brackishwater ponds and their effect on shrimp/fish production.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 111
 
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:300,000   
- CAPITAL EXPENSES:200,000   
- TOTAL:500,000   

PROJECT TITLE:Impact of brackishwater aquaculture on the mangrove environmentCODE: O-04
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Resources programme 
   
RESEARCH AREA(S): CODE(S):
- Brackishwater production management02–05
- Riverine fisheries production management06-04
- Socio-economics 14-08

OBJECTIVES:

  1. assessment of the impact of brackishwater aquaculture practices on the mangrove environment, incl. effect of seed collection and of pollution from intensified farming;
  2. translation of findings into recommendations to the Government for lilmits and/or protective measures.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1989   
- DATE OF COMPLETION:31.12.1991   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 111
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:350,000   
- CAPITAL EXPENSES:300,000   
- TOTAL:650,000   

PROJECT TITLE:Survey of potential areas for brackishwater farmingCODE: O-05
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Resources programme 
   
RESEARCH AREA(S): CODE(S):
- Brackishwater production management02–05
- Socio-economics 14-08

OBJECTIVES:

  1. identification of the places in different areas of Bangladesh, which are suitable for extensive, semi-intensive and intensive brackishwater aquaculture, based on soil and water characteristics;
  2. preparation of recommendations to the Government with respect to area development plans.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 22-
- NO OF SUPPORTING STAFF: 11-
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:500,000   
- CAPITAL EXPENSES:250,000   
- TOTAL:750,000   

PROJECT TITLE:Hatchery technology for production of Penaeus monodon postlarvaeCODE: P-01
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Reproduction programme 
   
RESEARCH AREA(S): CODE(S):
- Reproduction marine and brackishwater species08-02/08-05
- Nutrition and feed 10-03/10-04
- Socio-economics 14-01

OBJECTIVES:

  1. development of hatchery models for large- and small-scale production of P. monodon seed;
  2. development of techniques for maturation of P. monodon through eyestock ablation;
  3. development of techniques for rearing nauplii to postlarvae;
  4. development of techniques for large-scale production of live food for feeding larvae, zoea and postlarval stages;
  5. determination of the economics of P. monodon hatcheries.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.08.1988   
- DATE OF COMPLETION:31.07.1991   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 333
- NO OF SUPPORTING STAFF: 444
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:1,000,000   
- CAPITAL EXPENSES:800,000   
- TOTAL:1,800,000   

PROJECT TITLE:Hatchery technology for production of Macrobrachium rosenbergii postlarvaeCODE: P-02
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Reproduction programme 
   
RESEARCH AREA(S): CODE(S):
- Reproduction marine and brackishwater species08-01/08-05
- Socio-economics 14-04

OBJECTIVES:

  1. development of hatchery models for large and small scale production of M. rosenbergii postlarvae;
  2. development of techniques for optimum survival during rearing of nauplii to postlarvae;
  3. popularization of hatchery techniques developed in this project and in project I-02 in Chandpur.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.08.1988   
- DATE OF COMPLETION:31.07.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF: 444
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:700,000   
- CAPITAL EXPENSES:500,000   
- TOTAL:1,200,000   

PROJECT TITLE:Techniques for transportation of shrimp seedCODE: P-03
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Reproduction programme 
   
RESEARCH AREA(S): CODE(S):
- Reproduction marine and brackishwater species08-05
- Health care brackishwater and marine species11-02
- Brackishwater pond management02-01/02-02

OBJECTIVES:

  1. maximization of survival of shrimp seed during transportation;
  2. determination of optimum salinity levels of the transporting medium for different species of shrimp;
  3. testing of the efficacy of different anesthetics in bringing down the metabolic activity and increasing the survival of seed during transportation;
  4. development of a method of acclimatization of transported seed before releasing into ponds.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 11-
   
ESTIMATED BUDGET (in Taka):   
- OPERATIONAL EXPENSES:150,000   
- CAPITAL EXPENSES:100,000   
- TOTAL:250,000   

PROJECT TITLE:Nursery management techniques for optimum production of shrimp juvenilesCODE: P-04
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Reproduction programme 
   
RESEARCH AREA(S): CODE(S):
- Brackishwater production management02-01/02-02/02–05

OBJECTIVES:

  1. increase of the survival of shrimp seed in production ponds by first rearing the postlarvae to juveniles in nursery ponds;
  2. determination of optimum stocking density of postlarvae in nursery ponds for maximum survival and growth;
  3. study of the influence of salinity and temperature on growth and survival of postlarvae;
  4. identification of the quantity and quality of fertilizers/manures and feed needed for optimum survival and growth.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:800,000   
- CAPITAL EXPENSES:100,000   
- TOTAL:900,000   

PROJECT TITLE:Breeding of seabass, Lates calcariferCODE: P-05
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Reproduction programme 
   
RESEARCH AREA(S): CODE(S):
- Reproduction marine and brackishwater species08–03
- Brackishwater production management02–03
- Socio-economics 14-05

OBJECTIVES:

  1. developments of techniques for maturation of L. calcarifer in ponds through manipulation of stocking density, fertilization of ponds, feed, and feeding rates;
  2. development of techniques for induced breeding;
  3. development of nursery management methods for rearing spawn to fry/ fingerlings;
  4. determination of the economic feasibility of seabass culture.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.08.1987   
- DATE OF COMPLETION:31.07.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:1,000,000   
- CAPITAL EXPENSES:200,000   
- TOTAL:1,200,000   

PROJECT TITLE:Techniques for breeding of mulletsCODE: P-06
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Reproduction programme 
   
RESEARCH AREA(S): CODE(S):
- Reproduction marine and brackishwater species08–03
- Brackishwater production management02–03
- Socio-economics 14–05

OBJECTIVES:

  1. development of techniques for pond maturation of commercially important species of mullets;
  2. development of techniques for induced breeding of mullet species;
  3. development of techniques for nursing of mullet fry/fingerlings;
  4. determination of the economic feasibility of mullet culture.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.08.1987   
- DATE OF COMPLETION:31.07.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 333
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:900,000   
- CAPITAL EXPENSES:400,000   
- TOTAL:1,300,000   

PROJECT TITLE:Survey of common shrimp diseasesCODE: Q-01
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Health care programme 
   
RESEARCH AREA(S): CODE(S):
- Health care brackishwater and marine species11–01

OBJECTIVES:

  1. identification of diseases and parasites that effect shrimp in commercial farming operations, their intensity of infection, and their economic damage;
  2. identification of environmental factors that lead to infection of shrimp in various stages;
  3. provision of diagnostic services to shrimp farmers.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.04.1988   
- DATE OF COMPLETION:31.03.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 111
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:500,000   
- CAPITAL EXPENSES:150,000   
- TOTAL:650,000   

PROJECT TITLE:The use of locally available drugs for controlling shrimp diseases/parasitesCODE: Q-02
 
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Health care programme 
   
RESEARCH AREA(S): CODE(S):
- Health care brackishwater and marine species11-02
- Socio-economics14-04

OBJECTIVES:

  1. identification of drugs/chemicals and their doses, that could control/prevent diseases and/or parasites of shrimps and other brackishwater culture organisms;
  2. determination of dosages needed for treatment individual organisms and ponds;
  3. preparation of extension pamphlets for dissemination of first-line health care information to shrimp farmers.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.08.1988   
- DATE OF COMPLETION:31.07.1991   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS:111
- NO OF SUPPORTING STAFF:222
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:450,000   
- CAPITAL EXPENSES:200,000   
- TOTAL:650,000   

PROJECT TITLE:Pond environment and shrimp qualityCODE: R-01
   
STATION OF EXECUTION:BFRS, Paikgacha 
   
PROGRAMME:Processing programme 
   
RESEARCH AREA(S): CODE(S):
- Brackishwater production management02–05
- Processing13-01

OBJECTIVES:

  1. determination of the effects of different pond-environmental factors on the quality of shrimp produced;
  2. development of techniques for improvement of the quality of shrimp produced.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1989   
- DATE OF COMPLETION:31.12.1992   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:300,000   
- CAPITAL EXPENSES:150,000   
- TOTAL:450,000   

PROJECT TITLE:Site survey for marine pen and cage cultureCODE: S-01
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Mariculture 
   
RESEARCH AREA(S): CODE(S):
- Mariculture production management01–01

OBJECTIVES:

  1. identification of logistic problems for marine pen and cage culture and determination of possible solutions;
  2. survey and mapping of suitable places for marine pen and cage culture;
  3. site selection for experimental work.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1987   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 1--
- NO OF SUPPORTING STAFF:1--
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:80,000   
- CAPITAL EXPENSES:20,000   
- TOTAL:100,000   

PROJECT TITLE:Marine pen and cage technologyCODE: S-02
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Mariculture 
   
RESEARCH AREA(S): CODE(S):
- Mariculture production management01–02
- Cage/pen production management03-02/03–05
- Nutrition and feed10-04
- Socio-economics14–01/14–05

OBJECTIVES:

  1. determination of optimal size and location for cages and pens;
  2. identification of suitable species for marine pen and/or cage culture;
  3. determination of the stocking density for optimum growth in cages and pens;
  4. adaptation of existing rearing technologies to the local situation for production of marketfish;
  5. development of optimum feeding technologies;
  6. determination of the economy of marine pen and cage culture.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF: 333
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:630,000   
- CAPITAL EXPENSES:380,000   
- TOTAL:1,010,000   

PROJECT TITLE:Site survey for mollusc cultureCODE: S-03
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Mariculture 
   
RESEARCH AREA(S): CODE(S):
- Mariculture production management01–03
- Marine fisheries production management07–02

OBJECTIVES:

  1. identification of logistic problems for culture of various mollusc species;
  2. analysis of availability and suitability (including hygienics) of sites for mollusc culture, including oysters, mussels, cockles and clams;
  3. selection of sites for experimental work.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1987   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 1--
- NO OF SUPPORTING STAFF:---
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:80,000   
- CAPITAL EXPENSES:-   
- TOTAL:80,000   

PROJECT TITLE:Mollusc farming systemsCODE: S-04
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Mariculture 
   
RESEARCH AREA(S): CODE(S):
- Mariculture production management01–04
- Marine fisheries production management07–03
- Reproduction marine and brackishwater species08–04
- Socio-economics14–01/14–05

OBJECTIVES:

  1. identification and on-site studies of spat collection and mollusc farming systems;
  2. studies on growth potential in dependence on prevailing nutrient availability;
  3. economics of mollusc culture for human consumption and/or for production of feed and fertilizers;
  4. development (or adaptation) of small-scale production technologies.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF:222
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:630,000   
- CAPITAL EXPENSES:480,000   
- TOTAL:1,110,000   

PROJECT TITLE:Production of other marine speciesCODE: S-05
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Mariculture 
   
RESEARCH AREA(S): CODE(S):
- Mariculture production management01–05
- Marine fisheries production management07–03/07–04
- Socio-economics14–02/14–05

OBJECTIVES:

  1. identification and evaluation of new opportunities for mariculture, including vertebrates, crustaceans, molluscs, and sea weeds;
  2. studies into the feasibility of production of the identified species in Bangladesh;
  3. implementation of feasible production systems on a pilot scale.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF:333
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:680,000   
- CAPITAL EXPENSES:170,000   
- TOTAL:850,000   

PROJECT TITLE:Reproduction of marine speciesCODE : S-06
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Mariculture 
   
RESEARCH AREA (S): CODE (S):
- Reproduction marine and brackishwater species08–04
- Marine fisheries production management07–03
- Nutrition and feed10-04

OBJECTIVES:

  1. survey of natural reproduction of commercially important marine species;
  2. research on (semi-) artificial reproduction of suitable marine species, including induction of maturation and ripening stimulation techniques, handling of eggs and larvae, etc.;
  3. development of technologies for nursing of larvae.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF: 444
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:650,000   
- CAPITAL EXPENSES:320,000   
- TOTAL:970,000   

PROJECT TITLE:Hatchery systems developmentCODE: S-07
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Mariculture 
   
RESEARCH AREA (S): CODE(S):
- Reproduction marine and brackishwater species08–05

OBJECTIVES:

  1. development of efficient hatchery techniques through adapation of existing techniques and technologies;
  2. studies into improvement of marine hatchery designs and lay-outs.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1990   
- DATE OF COMPLETION:31.12.1992   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF: 333
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:600,000   
- CAPITAL EXPENSES:400,000   
- TOTAL:1,000,000   

PROJECT TITLE:Stock assessment of marine speciesCODE: T-01
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Marine fisheries 
   
RESEARCH AREA (S): CODE(S):
- Marine fisheries production management07–01
- Socio-economics 14-02/14-08

OBJECTIVES:

  1. monitoring of the catch and CPUE of various types of fishing gear and analysis of the data;
  2. investigations into seasonal variations in landings, fishing areas, gear types, and sizes of fish captured;
  3. estimate of overall production and determination of fishing effort needed or wanted for the implementation of a sound resource management policy.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 444
- NO OF SUPPORTING STAFF: 555
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:1,400,000   
- CAPITAL EXPENSES:500,000   
- TOTAL:1,900,000   

PROJECT TITLE:Adaptive gear developmentCODE: T-02
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Marine fisheries 
   
RESEARCH AREA(S): CODE(S):
- Marine fisheries production management07–03

OBJECTIVES:

  1. survey of existing small- and large-scale gear and its use;
  2. development of gear for selective fishing of different fish species;
  3. development of gear for improvement of harvesting efficiency.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.03.1987   
- DATE OF COMPLETION:31.07.1988   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 11-
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:195,000   
- CAPITAL EXPENSES:125,000   
- TOTAL:320,000   

PROJECT TITLE:Survey of non-used resourcesCODE: T-03
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Marine fisheries 
   
RESEARCH AREA (S): CODE(S):
- Marine fisheries production management07–04
- Mariculture production management01–05
- Processing 13–01/13–02
- Socio-economics 14–05

OBJECTIVES:

  1. identification and survey of non-used marine resources, including trawler by-catch, sharks, rays, clams, sea weeds, etc.;
  2. determination of the product value of these resources;
  3. product development (food, feed, fertilizer, industrial products).
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1988   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 22-
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:240,000   
- CAPITAL EXPENSES:140,000   
- TOTAL:380,000   

PROJECT TITLE:Stock assessment of P. monodonCODE: T-04
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Marine fisheries 
   
RESEARCH AREA (S): CODE(S):
- Marine fisheries production management 07-01
- Brackishwater production management 02-04
- Socio-economics 14-02/14-08

OBJECTIVES:

  1. determination of seasonal variation in CPUE;
  2. analysis of seasonal variation in landings, fishing areas and sizes of P. monodon captured;
  3. determination of seasonal movement of P. monodon;
  4. estimate of overall production and fishing effort for the implementation of a sound management policy;
  5. location of spawning grounds and determination of their relative importance;
  6. location of the gateways towards the brackishwater area, their relative importance, and the factors that influence their importance.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF: 333
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:1,500,000   
- CAPITAL EXPENSES:800,000   
- TOTAL:2,300,000   

PROJECT TITLE:Marine ecologyCODE: U-01
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Marine ecology 
   
RESEARCH AREA (S): CODE(S):
- Marine fisheries production management 07-03
- Reproduction marine and brackishwater species 08-04

OBJECTIVES:

  1. survey of reproduction areas, natural breeding cycles, broodstock and fry/larvae of the commercially important marine species;
  2. analysis of recruitment success;
  3. plankton survey.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF: 222
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:330,000   
- CAPITAL EXPENSES:220,000   
- TOTAL:550,000   

PROJECT TITLE:Survey of diseases and parasitesCODE: U-02
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Marine ecology 
   
RESEARCH AREA (S): CODE(S):
- Health care of brackishwater and marine species11-01/11-02
- Marine fisheries production management07-03

OBJECTIVES:

  1. survey of the common parasites and intensities of infections in commercially important marine organisms, especially those suitable for mariculture;
  2. testing of local drugs on laboratory scale.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1989   
- DATE OF COMPLETION:31.12.1992   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 1--
- NO OF SUPPORTING STAFF: 111
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:250,000   
- CAPITAL EXPENSES:100,000   
- TOTAL:350,000   

PROJECT TITLE:Quality aspects of fisheries productsCODE: V-01
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Processing 
   
RESEARCH AREA (S): CODE(S):
- Processing 13-01
- Socio-economics 14-08

OBJECTIVES:

  1. preparation of lists of quality demands for fisheries products in the domestic and international markets;
  2. development of standardized sampling and analysis methodologies;
  3. development of hygienic systems for landing, handling, transportation, and marketing of fish and fisheries products.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 33-
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:400,000   
- CAPITAL EXPENSES:500,000   
- TOTAL:900,000   

PROJECT TITLE:Processing technologyCODE: V-02
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Processing 
   
RESEARCH AREA (S): CODE(S):
- Processing 13-02
- Marine fisheries production management 07-04
- Socio-economics 14-01

OBJECTIVES:

  1. adaptation and/or development of methodologies to increase the shelf-live of fish and fishery products;
  2. upgrading of unused marine resources into commercial products;
  3. determination of the economics of processing technologies.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 222
- NO OF SUPPORTING STAFF: 444
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:850,000   
- CAPITAL EXPENSES:400,000   
- TOTAL:1,250,000   

PROJECT TITLE:MarketingCODE: V-03
   
STATION OF EXECUTION:MFRS, Cox's Bazar 
   
PROGRAMME:Processing 
   
RESEARCH AREA (S): CODE(S):
- Processing 13-03
- Socio-economics 14–04

OBJECTIVES:

  1. survey of domestic and international needs and wishes for fishery products, including quality, quantity, appearance, packing, etc.;
  2. development of marketing scenarios.
TIME SCHEDULE:    
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: ---
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:150,000   
- CAPITAL EXPENSES:50,000   
- TOTAL:200,000   