1. INTRODUCTION

The main objective of the mission was to complete the revision of the detailed design documentation prepared by the Turkish engineers, based on drawings and specifications given by the Consultants during their last mission in November/December 1988.

Mr. L. Berg and Mr. R. Vétillart were designated Aquaculture and Hydraulic Engineering Consultants respectively, from the 20th February to 19 March 1989. The terms of reference and programme of the mission can be seen in Appendix 1.