Previous Page Table of Contents


Annex - References Consulted


Publications
Coordination unit
Bolivia
Nepal
Pakistan
Tunisia

Publications

PUB/95/7. Olthethen, Theo. Participatory Approaches to Planning/or Community Forestry. Results and Lessons from Case-Studies Conducted in Asia, Africa and Latin America. A Synthesis Report. Community Forestry Working Paper 2. Rome: FTPP.

PUB/96/8, Fé d'Ostiani, Luca and Patrizio Warren, Steps towards a Participatory and Integrated Approach to Watershed Management. A Qualitative Interim Revaluation of the Inter-regional Project/or Participatory Upland Conservation and Development, Based on Results of the Internal Technical Review Meeting (Tunis, 1-20 December 1995) Field Report No 1. Tunis: GCP/INT/542/ITA, Coordination Unit.

PUB/96/10b Kane, Marilee Women's Role in Natural resource management. A Slide-show Competition. Project Bulletin, Special Issue No I; 9-12. Tunis: GCP/INT/542/ITA.

PUB/96/10c M'Hamdi, Asma. From Diagnosis to Evaluation: Improved Tabouna Oven in Oued Sbaihya, Zaghouan. Project Bulletin, Special Issue No. 1: 12-13, Tunis: GCP/INT/542/ITA.

PUB/96/10e. Ambroso, Andrea The Use of Visual Tools during the PRA Feedback and the Problem-tree Exercise. Project Experience in Ben Ameur and Ben Rejeb. Project Bulletin, Special Issue No. 1: 17-22. Tunis: GCP/INT/542/ITA.

PUB/97/6 Fe d'Ostiani, L and Patrizio Warren Initial. Lessons Learned in Participatory Watershed Management. In Pren N. Sharma (ed.). "Participatory Processes for Integrated Watershed Management". PWMTA - FARM, Field Document No. 7. Kathmandu: GCP/RAS/161/NET - RAS/93/062.

Coordination unit

COO/91/9. Coordination Unit. Phase I Inter-regional Project Document "Inter-regional Project for Participatory Upland Conservation and Development". Rome: GCP/TNT/542/ITA.

COO/92/11. Oltheten, Theo Participatory Project Planning Guidelines for Case-studies in Community Forestry. Rome: FTPP

COO/93/4a. Fe d'Ostiani, Luca and Pieter Van Ginneken. Note on the general progress of the project and preliminary orientations for a follow-up phase. Rome: GCP/INT/542/ITA.

COO/93/40. Van Ginneken, Pieter. Consultant's Mission Report on Participatory Watershed Management (January - April 1993). Rome: GCP/INT/542/ITA.

COO/93/11. Coordination Unit. Phase II Inter-regional Project Document. "Inter-regional Project for Participatory Upland Conservation and Development". Rome: GCP/INT/542/ITA.

COO/94/1. Coordination Unit. Phase III Inter-regional Project Document. Rome: GCP/INT/542/ITA

COO/94/2. Fé d'Ostiani, Luca and Pieter Van Ginneken. Report on Project Internal Technical Review Meeting (29/11-10/12/1993). Rome: GCP/IN/542/ITA.

COO/94/3. Warren, Patrizio. Review of Project and Community-level Monitoring and Evaluation System. Rome: GCP/IN/542/ITA.

COO/94/8. Warren, Patrizio. Suggestions for Designing and Operating a Project and Community-level Monitoring and Evaluation System. Rome: GCP/INT/542/ITA

COO/95/9 Tomasin, Antonella. Mission Report to Pakistan and Nepal (31/05-10/07/1995). Tunis: GCP/TNT/542/ITA.

COO/96/9 Tomasin, Antonella. Report of the mission to Bolivia (14-23/08/96). Tunis: GCP/INT/542/ITA.

COO/96/11b. Tomasin, Antonella. Participatory Cost/Benefit Analysis in Feasibility Assessment, Monitoring and Evaluation of Income Generating Activities: A Review of Project Experience. Paper submitted to the Internal Technical Review, Hammamet 1996. Tunis: GCP/INT/542/ITA;

COO/96/11c. Tomasin, Antonella, Monitoring and Evaluation System in Pakistan. A Review of Project Experience. Paper submitted to the Internal Technical Review, Hammamet 1996.

COO/97/7. Coordination Unit. Follow-up phase Project Document. Inter-regional Project for Participatory Upland Conservation and Development. Tunis: GCP/INT/542/ITA.

Bolivia

BOL/93/4. Van Ginneken, Pieter. Informe de la Misión del Consultor Internacional en Manejo Participativo de Cuencas Hidrográficas, Bolivia (17-27/3/1993). Samaipata/Roma: GCP/INT/542/ITA.

BOL/93/5, Coimbra, Andrés, Miguel Lino, Raúl Roca y Javier Escobedo. Diagnóstico y planificación participativa del área del proyecto (Fase I) - Informe Final. Samaipata: GCP/INT/542/ITA.

BOL/93/10, Warren, Patrizio. Informe de la misión del Consultor Internacional en Sistemas de Monitoreo y Evaluación Participativa, Samaipata (6/9-18/10/92). Samaipata/Roma: GCO/INT/542/ITA.

BOL/93/11. Pereira Lima, Luis. Taller de Evaluación Interna. Samaipata: GCP/INT/542/ITA.

BOL/94/2. Pereira Lima, Luís. Evaluación interna y programación de actividades para 1994. Samaipata: GCP/INT/542/ITA.

BOL/94/7, Pereira Lima, Luís Taller de Evaluación y Re-planificación Interna. Samaipata: GCP/INT 542/ITA.

BOL/94/9. Unidad de Coordinación y Equipo del Proyecto. Plan de Trabajo para la Fase de Extensión del Proyecto Interregional para la Participación en la Conservación y el Desarrollo de las Tierras Altas, Bolivia. Roma, Santa Cruz, Samaipata: GCP/INT/542/ITA.

BOL/94/10a. Proyecto SEARPI/FAO Informe Interino de la Primera Fase del Proyecto: Junio 1992 - Agosto 1994 Samaipata/Santa Cruz: GCP/INT/542/ITA.

BOL/94/10b. Warren, Patrizio Informe de la Misión del Consultor Internacional sobre sistemas de seguimiento y evaluación participativa (22 de Agosto - 4 de Octubre ]994). Samaipata/Roma: GCP/INT/542/ITA.

BOL/95/1 Proyecto SEARPI/FAO. Evaluación económica del fondo rotatorio de semillas de papas. Samaipata: GCP/INT/542/ITA.

BOL/95/6. Departamento de Seguimiento y Evaluación. Funcionamiento del Sistema de Seguimiento y Evaluación del Proyecto SEARPI-FAO. Samaipata: GCP/INT/542/ITA.

BOL/95/8. Warren, Patrizio. Informe de la misión del Consultor Internacional sobre sistemas de seguimiento y evaluación y métodos participativos (12 de mayo - 4 de junio 1995). Roma/Samaipata: GCP/INT/542/ITA.

BOL/95/12a. Pereira Lima, Luís, Miguel Lino Cárdenas, y Nelson Pacheco Rodríguez. Informe del Taller Interno de Evaluación y Replanificación (29 y 30 de Noviembre y 1 de diciembre de 1995). Samaipata: GCP/INT/542/ITA.

BOL/95/12b. Roca Steveriynk, Ricardo. Como hacer un análisis participativo de costo/beneficio. Una guía para extensionistas. Samaipata: GCP/INT/542/ITA

BOL/95/12c. Roca Steveriynk, Ricardo y Javier Escobedo. Análisis participativo de costos/beneficios en un proyecto de manejo de cuencas. Experiencias en Samaipata, Bolivia. Samaipata: GCP/INT/542/ITA.

BOL/96/4. Roca Steveriynk, Ricardo (coordinador). Manual de seguimiento y evaluación de actividades conservacionistas. Samaipata: GCP/INT/542/ITA.

BOL/96/6b. Pacheco Rodríguez, Nelson, Luís Pereira Lima, Use van der Put, y Ricardo Roca Steveriynk. Informe del Taller Interno de Evaluación y Re-planificación. Samaipata: GCP/INT/542/ITA. (incluye resultados de la Primera Campaña Contra la Erosión del Suelo y Evaluación de Actividades Conservacionistas).

BOL/96/6c. Roca Steveriynk, Ricardo y Luis Pereira Lima, Material para la valuación de las actividades conservacionistas. Samaipata: GCP/INT/542/ITA.

BOL/96/9b. Escobedo, Javier. Sistemas cié producción sostenibles en las tierras montañosas del Oriente Boliviano: experiencia en Samaipata.

BOL/96/10a. Delnoye, Rick. Participation in Conservation: the Case of Bella Vista. A Case Study About an Experience in Participatory Upland Conservation and Development. Samaipata: GCP/INT/542/ITA.

BOL/96/10b. Escobedo Urquizo, Javier. El nuevo rol de los municipios en la gestión integral y participativa de las cuencas hidrográficas. Experiencia en la Cuenca Alta del Río Piraí, Municipio de Samaipata (Santa Cruz, Bolivia). Ponencia presentada en el IV Encuentro de la Red Nacional de Manejo de Cuencas (Piura, Perú: Octubre de 1996). Samaipata: GCP/INT/542/ITA

BOL/96/11a. Pereira Lima, Luis. Informe del Taller Interno de Evaluación y Replanificación. Samaipata: GCP/INT/542/ITA (incluye Evaluación de la participación de la mujer).

BOL/96/11b. Proyecto SEARPI-FAO Estratificación Socioeconómica y Cultural de la Cuenca Alta del Río Piraí. Documento de Campo ?9. Samaipata: GCP/INT/542/ITA.

BOL/96/11d. Pereira Lima, Luís. Evaluación de la participación de la mujer en actividades que apoya el Proyecto en la Cuenca Alta del Río Piraí en el período Julio '95 - Septiembre '96. Samaipata: GCP/INT/542/ITA.

BOL/97/5a. Escobedo, Urquizo, Javier. La planificación participativa municipal y el manejo integral de cuencas. Experiencia en la Cuenca Alta del Río Piraí, Municipio de Samaipata. Documento presentado a la reunión de la Red Boliviana de Manejo Integral de Cuencas (Tarija, 15-16 mayo 1997). Samaipata: GCP/INT/542/ITA.

BOL/97/5b. Scotto, Fabio. Ejemplo de Evaluación Económica de Prácticas de Conservación. Samaipata: GCP/INT/542/ITA.

BOL/97/7. Warren, Patrizio. Informe de la Misión del Consultor Internacional sobre Sistemas de Planificación, Seguimiento y Evaluación y Métodos Participativos. Samaipata (14 -29 de Junio 1997). Roma/Samaipata: GCP/INT/542/ITA. (Incluye entrevistas, cuestionarios y otros documentos producidos a lo largo de la Misión).

BOL/97/8. Rojas, Arturo. Experiencia con el Sistema de Información Geográfica en el manejo de cuenca. Samaipata: GCP/INT/542/ITA.

Nepal

NEP/92/3. Coordination Unit and Project Team. Project Document. Inter-regional Project for Participatory Upland Conservation and Development, Nepal. Rome/Kathmandu: GCP/INT/542/ITA.

NEP/92/9a. Coordination Unit and Project Team. Indicative Workplan for the Assessment and Planning Phase (16 October 1992 - 15 January 1993) Gorkha GCP/INT/542/ITA.

NEP/92/9b. Win, Sein, Hogan Rufelds, Goapl Upadaya and Deepak Amathya. Progress of Participatory Planning Phase. Gorkha: GCP/INT/542/ITA.

NEP/93/lb. Shrestha, R.L. Joshi: Participatory Assessment and Planning Field Exercise on Gender Issues, Bhusunde Khola Watershed, Gorkha.Gorkha: GCP/INT/542/ITA.

NEP/93/3. PUCD Project. Final Report of the Initial Participatory Assessment and Planning Phase. Gorkha: GCP/INT/542/ITA.

NEP/93/4. Van Ginneken, Pieter Report on the Mission of the International Consultant in Participatory Watershed Management (9-20/1/1993). Gorkha/Rome: GCP/INT/542/ITA.

NEP/93/7. Mori, Paolo. Mission report (6/5-5/7/1993). Gorkha/Rome: GCP/INT/542/ITA.

NEP/93/12a. Mori, Paolo. Mission report (12/10-11/12/1993). Gorkha/Rome: GCP/INT/542/ITA.

NEP/94/lb. SAGUN (Social Action for Grassroots Organization). Micro Planning for 1994. Gorkha/Kathmandu: GCP/INT/542/ITA.

NEP/94/3. PUCD Project. Conceptual Paper on Participatory Upland Conservation and Development. Gorkha: GCP/INT/542/ITA.

NEP/94/9. Coordination Unit and Project Team. Three-year workplan. Inter-regional Project for Participatory Upland Conservation and Development, Nepal. Rome/Kathmandu: GCP/INT/542/ITA.

NEP/95/5. Ohler, Fritz and Chapa, Deepak R. Inter-group Linkages and Experience Sharing Workshop, Bhusunde Khola Watershed (5-13/02/95). Gorkha GCP/INT/542/ITA.

NEP/95/10a. Warren, Patrizio. Mission Report of the Consultancy on Monitoring and Evaluation for the Field Component in Nepal (10/9 - 1/10/1995). Gorkha/Rome: GCP/INT/542/ITA.

NEP/95/10b. PUCD Project. Project Team Building and Conceptual Workshop (16 -20/8/1995). Field Document 3/95. Gorkha: GCP/INT/542/ITA.

NEP/96/3a. Bahadur Singh, Surya. Participatory Livestock and Agro-forestry Development Plan for Bhusunde Khola Watershed. Field Document 1/96- Gorkha: GCP/INT/542/ITA.

NEP/96/3b. NEW ERA, Development Research & Training for Change. A Training Report on Participatory Rural Appraisal. Field Document 2/96. Gorkha: GCP/INT/542/ITA.

NEP/96/4a. Rimal, Basanat Kumar. A Concept Paper Prepared/or Review Mission Aimed at Strengthening arid Improving the Participatory Planning Process and Management Skills in Watershed Management for Nepal. Gorkha: GCP/INT/542/ITA

NEP/96/4c. Qwist-Hoffman, Helle Community Action Plans Database/or Bhusunde Khola Watershed. Gorkha: GCP/INT/542/ITA

NEP/96/10a. PUCD Project. User Groups Self-Reliance Training Workshops in the Bhusunde Khola Watershed From 1-6 May 1996. Field Document 5/96 Gorkha GCP/INT/542/ITA.

NEP/96/10b. Fé d'Ostiani, Luca. Note on the Mission to Nepal. Gorkha/Kathmandu: GCP/INT/542/ITA.

NEP/96/10c. Warren, Patrizio. Consultancy on Monitoring and Evaluation for the Field Component in Nepal. Kathmandu. Gorkha and Bhusunde Khola Watershed, 18 September - 14 October 1996. Mission Report. Gorkha/Rome: GCP/INT/542/ITA

NEP/96/10d. Rimal, B.K., B.R. Dhungana and F.M.J. Ohler (editors) Project Self-Evaluation Workshop. Gorkha 11-12 July 1996. Field Document 6/96 Gorkha: GCP/INT/542/ITA.

NEP/96/10e. NEW ERA, Development Research & Training for Change Participatory Rural Appraisal Planning, Monitoring and Evaluation Guidelines in Watershed Management. A Field Guide. Field Document 3/96 Kathmandu/Gorkha: GCP/INT/542/ITA.

NEP/96/12a. Warren, Patrizio, Pushpa Lal Moktan, Deepak Raj Chapa. Strengthening the Participatory Process through Community Based Evaluation and Re-Planning Workshops. Report of a Pilot Experience Carried out by Local User Groups and Project Staff in Majghaon Village, Choprak VDC (Bhusunde Khola Watershed, 10-11 October 1996. Field Document 7/96. Rome/Gorkha: GCP/INT/542/ITA.

NEP/97/2a. Andreasen, L; and H. Qwist-Hoffmann. A Framework for an Economic Evaluation of Improved Goat Production by Women's Groups in the Bhusunde Khola Watershed, Gorkha, Nepal. Gorkha. GCP/INT/542/ITA.

NEP/97/2D. Ohler, Frits. Results of the 1996 Dry Season Evaluation of Water Source Protection Activities Completed in 1993 - 1995. Field Document 1/97 Gorkha: GCP/INT/542/ITA.

NEP/97/50. Chapa. D.R., A. Pouydal, H. Qwist Hoffmann and F.M.J. Ohler Participatory Rural Appraisal and Planning in the Bhusunde Khola Watershed from October 1995 to January 1997. Field Document 3/97. Gorkha: GCP/INT/542/ITA.

NEP/97/7. Ohler, Frits. Participatory Implementation in 1996 and 1997 of 26 Community Action Plans Formulated Between October 1995 and January 1996 in the Bhusunde Khola Watershed. Field Document 4/97. Gorkha: GCP/INT/542/ITA.

NEP/97/10. Ohler, Frits. Monitoring and Evaluation of 83 User Groups in the Bhusunde Khola Watershed. Field Document 7/97. Gorkha: GCP/INT/542/ITA.

Pakistan

PAK/92/3. Coordination Unit and Project Team. Plan of Operations for the First Phase of the Inter-regional Project for Participatory Upland Conservation and Development, Pakistan. Quetta/Rome: GCP/INT/542/ITA.

PAK/93/2a. Van Ginneken, Pieter. Report of the Mission of the International Consultant in Participatory Watershed Management. Pakistan: 21 January - 3 February 1993. Quetta/Rome: GCP/INT/542/ITA.

PAK/93/2b. Miagostovich, Marco. Final Report of the Initial Participatory Assessment and Planning Phase. Quetta: GCP/INT/542/ITA.

PAK/93/5 Kane, Marilee Consultant's Progress Report. Quetta: GCP/INT/542/ITA.

PAK/93/9a. Palmeri, Paolo. Improving the Project's Participatory Approaches. Consultant Report 3 Quetta: GCP/INT/542/ITA.

PAK/93/9b. Jahangir, Arbab Mohammad. Case-Study on Participatory Planning of the Inter-regional Project for Participatory Upland Conservation and Development (GCP/INT/542/ITA. Pakistan) Quetta/Rome: GCP/INT/542/ITA and FTPP

PAK/93/11. Kane, Marilee Final Report of the Initial Participatory Assessment/planning and Implementation by the Women's Programme. Quetta: GCP/INT/542/ITA.

PAK/94/9. Coordination Unit and Project Team. Three-year workplan for the Extension Phase of the Inter-regional Project for Participatory Upland Conservation and Development, Pakistan. Quetta/Rome: GCP/INT/542/ITA.

PAK/94/10. Qureshi, Jalal-ud-din. Monitoring of Ground Water Levels in Kanak Valley, Mastung. Monitoring Report No. 1. Quetta: GCP/INT/542/ITA.

PAK/95/3b. Warren, Patrizio. Mission Report of the Consultant in Monitoring and Evaluation and Participatory Methods for the Field Component in Pakistan (28/1 -28/2 1995). Quetta/Rome: GCP/INT/542/ITA.

PAK/95/6. Kane, Marilee. Convention 14 June 1995: Women's Voices. Quetta: GCP/INT/542/ITA.

PAK/95/9a. Miagostovich, Marco. Quantitative Data on Project's Activities and Outputs. Monitoring Report 2. Quetta: GCP/INT/542/ITA.

PAK/95/10b. Warren, Patrizio. Mission Report of the Consultant in Monitoring and Evaluation and Participatory Methods for the Field Component in Pakistan. Follow-up Mission. Quetta/Rome: GCP/INT/542/ITA.

PAK/95/11. Project team. Three Years of Project Activities. Quetta: GCP/INT/542/ITA.

PAK/95/12a. Kane, Marilee. Village Development Planning as a Mapping Exercise. Paper submitted to the Internal Technical Review Meeting (Tunis, December 1995) Quetta: GCP/INT/542/ITA.

PAK/96/2a. Kane, Marilee. On the Natural resource management Slide Show. Field Notes. Quetta: GCP/INT/542/ITA.

PAK/96/7a. Mori, Paolo Second Phase. Mid-term Progress Report. Quetta: GCP/INT/542/ITA

PAK/96/7b. Kane, Marilee. A Slide Competition on Natural resource management in Noza, Kanak Valley. Quetta: GCP/INT/542/ITA

PAK/96/11a. Warren, Patrizio. Note on a Brief Follow-up Visit of the M&E Consultant to the Field Component in Pakistan (15 - 22/10/1196). Quetta/Rome: GCP/INT/542/ITA.

PAK/96/11b. Mori, Paolo. Monitoring and Evaluation System at Community Level. Examples from Pakistan. Paper submitted by the NFT in Pakistan to the Internal Technical Review, Hammamet 1996 Quetta: GCP/INT/542/ITA

PAK/97/3. Kane, Marylee. The Credit Programme and Income Generating Activities of Brahui Women. Working Paper N° 3 Quetta: GCP/INT/542/ITA - Pakistan

PAK/97/7. Kane, Marylee. A Community Evaluation of the FAO Inter-Regional Project for Participatory Upland Conservation and Development. Working Paper N° 2. Quetta: GCP/INT/542/ITA - Pakistan.

PAK/97/8. Mori, Paolo and Shah Rehman. Range land Rehabilitation in Balochistan. The Experience of Kanak Valley. Working Paper N° 4. Quetta: GCP/INT/542/ITA -Pakistan.

Tunisia

TUN/94/9. Unité de coordination et Équipe du Projet. Plan d'Opérations du Projet Inter - régional pour la Conservation et le Développement à Caractère Participatif des Hautes Terres (GCP/INT/542/ITA), Tunisie. Tunis/Zaghouan: GCP/INT/542/ITA.

TUN/95/4. Warren, Patrizio. Plan de formation sur la mise en route du processus participatif pour l'équipe de terrain de la composante tunisienne. Rome/Tunis: GCP/INT/542/ITA.

TUN/95/11. Rossi, Massimo. Formation de l'équipe pluridisciplinaire et démarrage du diagnostic participant dans le bassin versant de l'Oued Sbaihya. Rapport de Mission. Zaghouan/Tunis: GCP/INT/542/ITA.

TUN/96/1b. Zighidi, Moncef. Proposition de Programme d'Intervention du Consultant en Sociologie. Zaghouan/Tunis: GCP/INT/542/ITA.

TUN/96/3b. Équipe du projet. Planification à la base douars Ben Ameur, Ben Rejeb, Dhouaya et El Agailia. Plans initiaux, mars 1996.. Zaghouan: GCP/INT/542/ITA.

TUN/96/3c. Zighidi, Moncef. La trilogie diagnostic, planification, action.Mission d'appui en sociologie, développement communautaire et méthodes participatives. Note N° 3. Tunis: GCP/INT/542/ITA.

TUN/96/5. Ambroso, Andréa. Note sur l'application des outils visuels pendant la restitution des informations et la construction de l'arbre à problèmes dans les douars de Ben Ameur et Ben Rejeb. Zaghouan: GCP/INT/542/ITA

TUN/96/6a. Rossi, Massimo. Formation de l'équipe pluridisciplinaire et planification participative dans le bassin versant de l'Oued Sbaihya. Rapport de mission Zaghouan: GCP/INT/542/ITA.

TUN/96/6b. Warren, Patrizio. Rapport de mission du consultant en méthodes participatives et systèmes de suivi et évaluation. Zaghouan 15 mai - 5 juin 1996. Zaghouan/Rome: GCP/INT/542/ITA.

TUN/96/7. Toumia, L., Ali Ben Mabrouk et Andréa Ambroso. Note sur la démarche appliquée pour la phase de programmation. Zaghouan: GCP/INT/542/ITA

TUN/96/8a. Ambroso, Andréa. Réflexions sur l'application du système de planification, suivi et évaluation Zaghouan: GCP/INT/542/ITA.

TUN/96/8b. Ben Mabrouk, Ali. Diagnostic et planification participatifs: calendrier. Zaghouan: GCP/INT/542/ITA.

TUN/96/8c. Ben Boubaker, Brigitte. Itinéraire méthodologique des phases planification et programmation. Zaghouan/Beja: GCP/INT/542/ITA.

TUN/96/9a. Warren, Patrizio. Auto-évaluation formative de l'expérience du diagnostic et de la planification participatifs (Oued Sbaihya, Septembre 1995 - Juillet 1996) Zaghouan: GCP/INT/542/ITA.

TUN/96/9c. Ambroso, Andréa. L'itinéraire méthodologique pour le DPP proposé pour le reste des douars de la zone de Oued Sbaihya. Zaghouan: GCP/INT/542/ITA.

TUN/96/9d. M'Hamdi, Asma. Rapport mensuel d'activités (1-31/8/96). Zaghouan: GCP/INT/542/ITA.

TUN/96/10a. Équipe du Projet. Compte rendue de la réunion de re-programmation et d'évaluation du système de PSE (3 octobre 1996). Zaghouan: GCP/INT/542/ITA.

TUN/96/10b. M'Hamdi, Asma. Rapport mensuel d'activités (1-30/9/96). Zaghouan: GCP/INT/542/ITA.

TUN/96/11a. M'Hamdi Asma. Rapporte Trimestriel. Période de 1/8 au 31/10/1996. Zaghouan: GCP/INT/542/ITA.

TUN/96/11b. M'Hamdi, Asma. Rapport mensuel d'activités (1-31/1096). Zaghouan: GCP/INT/542/ITA.

TUN/96/12a. Équipe du Projet. Premier rapport sur les diagnostic et la planification participatifs dans les bassin versant de l'Oued Sbaihya. Zaghouan: GCP/INT/542/ITA.

TUN/96/12b. Compte rendu de la réunion d'évaluation du système de PSE et de re-programmation. Zaghouan: GCP/INT/542/ITA.

TUN/96/12c. Hemda. Évaluation de l'acceptabilité des couvercles à tabouna par les Femmes de quatre douars (25 décembre 1996). Zaghouan: GCP/INT/542/ITA.

TUN/96/12d. M'Hamdi, Asma. Rapport trimestriel. Période du 1/11/96 au 31/1/1997. Zaghouan: GCP/INT/542/ITA

TUN/96/12e M'Hamdi, Asma Rapport mensuel d'activités (1-30/1 1/96). Zaghouan: GCP/INT/542/ITA

TUN/97/1a. M'Hamdi, Asma Du diagnostic à l'évaluation. Action couvercle à tabouna. Zaghouan: GCP/INT/542/ITA

TUN/97/1b, Équipe du projet Micro-résultats pour le premier trimestre 1997. Zaghouan: GCP/INT/542/ITA

TUN/96/1e. M'Hamdi, Asma. Rapport mensuel d'activités (1-31/12/96). Zaghouan: GCP/INT/542/ITA.

TUN/97/2a. M'Hamdi, Asma. Rapport mensuel d'activités. (1 - 31 Janvier 1997). Zaghouan: GCP/INT/542/ITA.

TUN/97/2b. Équipe du Projet. La réorientation participative du programme de reboisement de la foret de Sidi Salem dans le bassin versant de l'Oued Sbaihya. Zaghouan: GCP/INT/542/ITA.

TUN/97/6a. Ambroso, Andréa Indicateurs et mesure de l'érosion du sol dans le bassin versant de l'Oued Sbaihya. Zaghouan: GCP/INT/542/ITA.

TUN/97/6b. Équipe du projet. Micro-résultats programmés pour les mois de juin, juillet et août 1997. Zaghouan: GCP/INT/542/ITA.

TUN/97/8. M'Hamdi, Asma. Projet avicole. Analyse de faisabilité participative. Enquête d'identification des bénéficiares. Zaghouan: GCP/IN/542/ITA.

Inter - regional Project Participatory Upland Conservation and Development - GCP/INT/542/ITA

Viale delle Terme di Caracalla, FAO 00153, Rome, Italy

Ph.: 00 396 57055905 - Fax: 00 396 57056445 - E-mail: [email protected]


Previous Page Top of Page