Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | FAO policy on and facilitation of cooperative arrangements with UN system entities | ||||
601 | Formulation and/or provision of advice, review and clearance of relationship agreements between FAO and other UN system entities. | Provision of services to staff, departments and members | UNC | Completed | |
602 | Updated list of relationship agreements between FAO and other UN system entities. | Provision of services to staff, departments and members | UNC | Completed | |
603 | Formulation and/or provision of advice, review and clearance of relationship agreements between FAO and other UN system entities, maintaining a list of such agreements. | Provision of services to staff, departments and members | Completed | ||
604 | Coordination of FAO's responses to requests for input to reports of the UN Secretary-General for the General Assembly, ECOSOC and other intergovernmental bodies on issues which are political or cut across the work of several FAO departments | Provision of services to staff, departments and members | Completed | ||
605 | Provision of advice to ODG and other units on invitations to be extended to UN system organizations for FAO intergovernmental meetings. | Provision of services to staff, departments and members | Completed | ||
002 | FAO policy and participation in high-level UN system coordination mechanisms at corporate level | ||||
601 | Advice provided to ODG and concerned units on interagency coordination and cooperation and on the interface between FAO sectoral activities and intersectoral UN system work. | Provision of services to staff, departments and members | UNC | Completed | |
602 | Preparation of FAO's participation to the sessions of the UN system Chief Executive Board (CEB), High Level Committee on Programmes (HLCP) and other inter-agency coordination arrangements. | Provision of services to staff, departments and members | UNC | Completed | |
603 | Coordination of FAO's responses to requests for input to reports of the UN Secretary-General for the General Assembly, ECOSOC and other intergovernmental bodies on issues which are political or cut across the work of several FAO departments. | Provision of services to staff, departments and members | UNC | Completed | |
604 | Provision of advice to ODG and other units on invitations to be extended to UN system organizations for FAO intergovernmental meetings. | Provision of services to staff, departments and members | UNC | Completed | |
003 | UN system meetings management | ||||
601 | Coordination of FAO representation at external meetings convened by the UN system organizations. | Provision of services to staff, departments and members | UNC | Completed | |
602 | Facilitation of a meetings management system for maintaining a computerized database on external meetings. | Provision of services to staff, departments and members | UNC | Completed | |
004 | UN documentation service | ||||
601 | UN system documentation services, including selection and retrieval of documents of relevance to FAO and their distribution to concerned FAO units | Information exchange and coordination | UNC | Completed | |
005 | FAO participation in UN system intergovernmental bodies and liaison with their secretariats - New York | ||||
601 | Representation of FAO at meetings in New York | Provision of services to staff, departments and members | Completed | ||
602 | On behalf of FAO, liaison with representatives of the UN system entities in New York, the secretaries of these organizations, as well as other intergovernmental, non-governmental and private institutions. | Provision of services to staff, departments and members | Completed | ||
006 | FAO participation in UN system intergovernmental bodies and liaison with their secretariats - Geneva | ||||
601 | Representation of FAO at meetings in Geneva | Provision of services to staff, departments and members | Completed | ||
602 | On behalf of FAO, liaison with representatives of the UN system entities in Geneva, the secretaries of these organizations, as well as other intergovernmental, non-governmental and private institutions | Provision of services to staff, departments and members | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Contribution to PRSPs, CCAs, UNDAF and similar development assistance frameworks and support to the formulation and implementation of the NMTPFs | ||||
601 | FAO Representations assisted in assessing technical assistance needs and priorities, in consultation with national authorities, UN agencies, IFIs and other stakeholders, which should be consistent with PRSPS and MTEF and with UNDAF. | Technical advice to Members and field programme support | Completed | ||
602 | Contribution to joint programming under UNDG umbrella and support to the formulation and implementation of NMTPFs. | Technical advice to Members and field programme support | Completed | ||
002 | Coordination of FAO's position on policy matters related to humanitarian assistance and liaison with relevant UN entities | ||||
601 | Coordination of FAO's position on policy matters related to humanitarian assistance | Policy and legislative advice | TCE | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Formulation and monitoring the implementation of coordination and decentralization policy | ||||
601 | Preparation of policy papers and proposals for strengthening coordination and decentralization. | Provision of services to staff, departments and members | FAP FCD FEU FLA FNE FRA RAF RAP REU RLC RNE SAA SAFR SAP SAPA SAS SEC SEU SEUR SFC SFE SFS SFW SLA SLAC SLC SLL SLS SNEA SNG SNN SNO | Completed | |
602 | Review of various documents on coordination and decentralization received from other Units and external stakeholders. | Provision of services to staff, departments and members | Completed | ||
603 | Mechanisms to identify emerging coordination and decentralization issues and to follow-up on them (including recommendations). | Provision of services to staff, departments and members | Completed | ||
604 | Monitoring and resolution of coordination and decentralization issues. | Provision of services to staff, departments and members | Completed | ||
605 | Adequate systems to monitor factors affecting DO performance, including relationships of DOs with stakeholders and the evolving UN system role at the country level. | Provision of services to staff, departments and members | Postponed | ||
606 | Update and monitor implementation of corporate guidance documents and reporting of DO, including CRR, handbooks, and periodic reporting. | Information products, systems, databases | Completed | ||
607 | Follow-up on senior management decisions and requests for actions as well as HQ's units support to the work of DOs. | Provision of services to staff, departments and members | Completed | ||
608 | A computer-based reporting system established to periodically apprise senior management on the status of coordination and decentralization function. | Provision of services to staff, departments and members | Postponed | ||
609 | Enhanced organizational learning through contributions to Communications Plans and related work (COIN, Internet, Intranet); briefings and trainings; e-fora. | Provision of services to staff, departments and members | Completed | ||
610 | Follow-up on Resident Coordinator issues regarding country offices, including selection of RC, reporting and authorities. | Provision of services to staff, departments and members | Completed | ||
611 | Representation of DOs in consultations regarding UN system coordination and collaboration. | Other | Completed | ||
002 | Coordination Support to the Regional Conferences, Regional Offices, Sub-regional Offices, Liaison Offices, FAOR Offices and Contact Points with REIOS | ||||
601 | Oversight of process of preparation for and the organization of the Regional Conferences, including guidance on improvement and the preparation, clearance and finalization of provisional and pre-session documents and reports. | Provision of services to staff, departments and members | Completed | ||
602 | Support provided to the establishment and workings of ROs, SROs, Liaison Offices, FAOR Offices, and Contact Points with REIOs, including planning and programming exercises. | Provision of services to staff, departments and members | Completed | ||
603 | Contributions to planning and implementation of reform proposals for DOs, including skill mix. | Provision of services to staff, departments and members | Completed | ||
604 | Review of collaborative arrangements with REIOs. | Provision of services to staff, departments and members | Postponed | ||
605 | Consolidate reports on the main recommendations of Regional Conferences and their implementation for governing bodies. | Information products, systems, databases | Completed | ||
606 | Coordination of ad-hoc regional events and major meetings as and when requested. | Provision of services to staff, departments and members | Completed | ||
607 | Contribution to the establishment of OCD intranet site | Provision of services to staff, departments and members | Cancelled | ||
003 | Contribution to Inter-departmental Coordination | ||||
601 | Support for the formulation of an annual corporate coordination workplan and its implementation. | Provision of services to staff, departments and members | Cancelled | ||
602 | Proposal submitted for a Corporate Coordination Committee, with OCD secretariat. | Other | Completed | ||
603 | Assist in the roll-out of the NMTPF | Provision of services to staff, departments and members | Completed | ||
604 | Contribution to organization-wide responses to trans-boundary emergencies. | Other | Completed | ||
605 | Participation in ID coordination mechanisms. | Provision of services to staff, departments and members | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Oversight and Operations of the Decentralized Offices | ||||
601 | 60 briefing programmes for newly-appointed and transferred FAORs, International Administrative Officers, Regional Representatives and Sub-regional Representatives, Director Liaison Offices | Provision of services to staff, departments and members | Completed | ||
602 | Up to 40 country missions with a view to providing oversight and monitoring the overall management performance. | Other | Completed | ||
603 | Selection of up to 40 FAORs, OTO/FAORs, International Administrative Officers (new and transfers). | Provision of services to staff, departments and members | Completed | ||
604 | Analysis and action on up to 70 Audit and External Audit Reports. | Provision of services to staff, departments and members | Completed | ||
605 | Training and staff development at the country as well as corporate level to build capacity and appropriate skills/competency mix in the decentralized offices. | Provision of services to staff, departments and members | Completed | ||
002 | Policy Advice and Reporting to Senior Management and Governing Bodies on Decentralized Offices Matters | ||||
601 | Establishment of 3 new FAO Representations, 3 new sub-regional offices and 6 new offices under multiple accreditation in the context of the reform. | Provision of services to staff, departments and members | Completed | ||
602 | Negotiation of cost-sharing arrangements with up to 3 countries in the context of the reform. | Other | Postponed | ||
603 | Revision of country agreements and application of new staff models to countries included in the reform regions | Provision of services to staff, departments and members | Postponed | ||
604 | Correspondence to member countries for the establishment of new sub-regional offices, including information to countries covered by the office. | Provision of services to staff, departments and members | Completed | ||
605 | Contribution to the formulation and revision of the decentralization policy and status of implementation of decentralization for Senior Management and Governing Bodies | Provision of services to staff, departments and members | Completed | ||
003 | Provision of Administrative, Budgetary, Information Technology and Communication Support for Decentralized Offices | ||||
601 | Contributing to the formulation of policies, procedures, guidelines and systems relating to the decentralized offices. | Provision of services to staff, departments and members | Completed | ||
602 | Policy advice and support on office management and administration. | Provision of services to staff, departments and members | Completed | ||
603 | Issuance of the updated FAOR Handbook (in COIN) incorporating a comprehensive set of office management guidelines for the administrative and budgetary functions under the responsibility of FAORs. | Provision of services to staff, departments and members | Completed | ||
604 | Extend development of COIN in the range of office management functions including financial planning and monitoring, dissemination of OCD management information to FAO Representations, collection of FAOR management reporting data and the development of a FAOR knowledge base. | Information products, systems, databases | Completed | ||
605 | Ensuring the progressive introduction and maintenance of electronic means in registry and library of FAO Representations | Provision of services to staff, departments and members | Completed | ||
606 | Ensuring the timely completion of the financial planning activity of some 1,030 positions; i.e. 802 posts, 194 government provided staff, 36 NCs, leading to the preparation of PWB, issuance of FAORs working allotments/revisions for 134 country offices and the preparation of consolidated PBR. | Provision of services to staff, departments and members | Completed | ||
607 | Overseeing, reviewing and reporting on FAOR's budgetary performance for 134 country offices. | Provision of services to staff, departments and members | Completed | ||
608 | Achieving the appropriate replacement of FAOR's fixed assets (PCs, vehicles, and other office equipment) within the constraints imposed by the current budget level. 164 vehicles to be replaced from total vehicle fleet of 388; 164 IT equipment to be replaced from total 1,885 from an overall total asset of 3,930 for an asset value of $ 13.449 million. | Provision of services to staff, departments and members | Completed | ||
609 | Up to 6 office management support missions covering up to a total of 15 country offices. | Other | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Country-level Networking: liaison with the Media and WFD; networking with research and academic institutions, NGOs, library systems and other knowledge centres | ||||
601 | Communicating FAO's mandate, activities, programmes and messages to relevant stakeholders, to the media and to the public at large for image building and active support to advocacy and outreach activities at country level. | Information exchange and coordination | Completed | ||
602 | Operating FAO virtual library and reference library. | Provision of services to staff, departments and members | Completed | ||
603 | Fostering and promoting the networking activities with local and knowledge centers including the UN system, the local libraries and research and academic and technology transfer institutions. | Information exchange and coordination | Postponed | ||
002 | Support to Agricultural Information and Knowledge Management; (WAICENT, Country level thematic groups and knowledge generation arrangements) | ||||
601 | Continuous active support to WAICENT and agricultural information and knowledge management. | Provision of services to staff, departments and members | Completed | ||
602 | Collecting and disseminating food and agriculture data. | Information products, systems, databases | Completed | ||
603 | Participating in the country level thematic groups and other knowledge generation mechanism. | Provision of services to staff, departments and members | Completed | ||
604 | Identifying the capacity building needs of the government counterpart institutions and integrating these in FAO's programmes and activities. | Capacity building | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Enhanced interaction and integration of FPMIS with other corporate tools (e.g. PIRES, FAS, Data Warehouse, HR Planning, ATLAS and COIN) | ||||
601 | Interaction of FPMIS with field programme-related aspects of other corporate databases improved | Provision of services to staff, departments and members | TCO | Postponed | |
602 | Links to FPMIS within other corporate databases established | Provision of services to staff, departments and members | TCO | Completed | |
002 | Accessibility of FPMIS worldwide, including access by project managers authorized to monitor project activities | ||||
601 | FPMIS accessible worldwide and being used regularly by budget holders project managers | Information exchange and coordination | TCO | Completed | |
003 | Adaptation of FPMIS to new technology, IT infrastructure standards and new user requirements | ||||
601 | FPMIS adapted and enhanced to meet new technology and IT standards | Provision of services to staff, departments and members | TCO | Completed | |
602 | FPMIS accessible worldwide and being used regularly by budget holders and project managers | Information products, systems, databases | TCO | Completed | |
004 | Maintenance and dissemination of policies, procedures and guidelines and of the Field Programme Manual | ||||
601 | Field Programme Manual maintained consistently, with users informed of updates/additions | Provision of services to staff, departments and members | TCO | Postponed | |
602 | Procedures reviewed and updated/revised or eliminated as necessary | Provision of services to staff, departments and members | TCO | Completed | |
603 | New procedures/guidelines developed to meet changing conditions/modes of implementation | Provision of services to staff, departments and members | TCO | Completed | |
005 | Consistent framework for field programme operations and improved knowledge on field programme operations and management imparted to budget holders | ||||
601 | Framework for field programme operations adjusted in consistent manner to meet external demands | Technical advice to Members and field programme support | TCO | Completed | |
602 | Briefings and training workshops organized for budget holders and concerned staff | Provision of services to staff, departments and members | TCO | Completed | |
006 | Field inspection and Ad hoc reviews to address atypical or complex field programme situations | ||||
601 | Atypical or complex field programme arrangements reviewed on an ad hoc basis, as required | Technical advice to Members and field programme support | TCO | Completed | |
007 | Secretariat of field programme related committees and working groups | ||||
601 | Provision of secretariat services for the field related activities (PPRC and FPC) | Provision of services to staff, departments and members | TCD TCO | Completed | |
602 | Provision of chair and secretariat of IDWG on TCPR and One UN | Provision of services to staff, departments and members | TCO | Completed | |
008 | Management and maintenance of FPMIS database and of supporting applications | ||||
601 | FPMIS accessible worldwide and being used effectively by FAO staff | Information exchange and coordination | TCO | Completed | |
009 | Development and maintenance of dedicated FPMIS modules (e.g. technical departments, TCE, TCOS, TCOT, TCAP, Knowledge Network) | ||||
601 | Development and maintenance of dedicated FPMIS modules (e.g. technical departments, TCE, TCOS, TCOT, TCAP, Knowledge Network) | Information exchange and coordination | Completed | ||
010 | Development and maintenance of Country Intelligence System as per IDWG cluster 4c | ||||
601 | Development and maintenance of Country Intelligence System as per IDWG cluster 4c | Provision of services to staff, departments and members | Postponed | ||
011 | Development and maintenance of customized versions of FPMIS for large scale projects | ||||
601 | Development and maintenance of customized versions of FPMIS for large scale projects | Information exchange and coordination | Completed | ||
012 | Support to MIS, including development and maintenance of related reports | ||||
601 | Support to MIS, including development and maintenance of related reports | Provision of services to staff, departments and members | Completed | ||
013 | Field programme-related reports based on analysis of available data, monitoring tools and special studies | ||||
601 | Available field programme-related data analyzed and special studies carried out, with reports produced | Information products, systems, databases | TCO | Completed | |
014 | Maintenance and enhancement of FPMIS PermRep Module | ||||
601 | Project-specific information provided to donor and recipient countries | Information exchange and coordination | TCO | Completed | |
015 | Support to editing, processing and distribution to recipient countries of projects terminal reports and statements | ||||
601 | Project terminal reports and statements edited, processed and distributed to recipient countries | Information products, systems, databases | TCO | Postponed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Coordination and monitoring at Programme level at Headquarters and decentralized structures | ||||
601 | Coordination of contributions from other units to the SPFS/NPFS/RPFS through a Technical Support Group | Information exchange and coordination | TCO | Completed | |
602 | Identification of resource requirements and assistance in resource mobilisation | Other | TCO | Completed | |
603 | Support to oversight structures | Other | TCO | Completed | |
604 | Overall monitoring and reporting | Other | TCO | Completed | |
002 | Coordination and monitoring of the formulation of NPFS/RPFS/SSC | ||||
601 | Support to formulation missions and internal process of appraisal and approval of project documents and agreements | Technical advice to Members and field programme support | TCO | Completed | |
003 | Coordination and monitoring of the implementation of SPFS/NPFS/RPFS/SSC | ||||
601 | Backstopping of project activities to ensure coherence with SPFS/NPFS/RPFS/SSC goals and approaches | Technical advice to Members and field programme support | TCO | Completed | |
602 | Support to the implementation of SPFS programmes | Technical advice to Members and field programme support | TCO | Completed | |
603 | Support to the implementation of NPFS programmes | Technical advice to Members and field programme support | TCO | Modified | |
604 | Support to the implementation of RPFS programmes | Technical advice to Members and field programme support | TCO | Modified | |
605 | Implementation of SSC Agreements | Technical advice to Members and field programme support | TCO | Completed | |
606 | Coordination of the preparation of impact reports on projects and programmes | Technical advice to Members and field programme support | TCO | Completed | |
004 | SPFS/NPFS/RPFS/SSC guidelines and reports, dissemination of information | ||||
601 | Preparation and dissemination of SPFS/NPFS/RPFS/SSC-related information including new or improved concept notes, guidelines and technical documents | Information exchange and coordination | TCO | Completed | |
602 | Updating of SPFS Website | Information products, systems, databases | TCO | Completed | |
005 | Capacity building for SPFS/NPFS/RPFS programme management at country and regional level | ||||
601 | Capacity building for SPFS/NPFS/RPFS programme management at country level | Capacity building | TCO | Completed | |
006 | Management of pro-poor small projects | ||||
601 | Appraisal of project proposals and coordination of approval process | Technical advice to Members and field programme support | TCO | Completed | |
602 | Monitoring implementation of pro-poor small community TeleFood projects | Information products, systems, databases | TCO | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Collection, analysis, synthesis and compilation of relevant political, economic, social, sectoral and programme/project information including for the production and continued updating of country and thematic briefs | ||||
601 | Relevant information updated, analyzed and incorporated into country briefs compiled with the assistance of a computer-based (Briefs Online, BOL), then reviewed and cleared by policy officers. Average 600 country briefs per year. | Information products, systems, databases | Completed | ||
602 | Regularly updated strengthened country information systems linked to sector work | Information products, systems, databases | Completed | ||
603 | Establishment of decentralized country information systems of regiona/sub-regional relevance | Information exchange and coordination | Completed | ||
604 | Regional and sub-regional diagnostic studies | Information products, systems, databases | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Advice and support to budget holders in the region | ||||
601 | Budget holders provided operational advice and support | Provision of services to staff, departments and members | RAF RAP REU RLC RNE TCO | Completed | |
002 | Monitoring of regional project pipeline and coordination of delivery forecasts | ||||
601 | Regional project pipeline monitored by RO | Technical advice to Members and field programme support | RAF RAP REU RLC RNE TCO | Completed | |
602 | Delivery forecasts for national/regional projects within region coordinated by RO | Provision of services to staff, departments and members | RAF RAP REU RLC RNE TCO | Completed | |
003 | Management reports for the Regional Representative and headquarters | ||||
601 | Regular management reports produced for Regional Representative and headquarters | Provision of services to staff, departments and members | RAF RAP REU RLC RNE TCO | Completed | |
602 | Recommendations/issues requiring management decision/follow-up highlighted in reports | Provision of services to staff, departments and members | RAF RAP REU RLC RNE TCO | Completed | |
603 | Staffing levels and revenue planned on basis of management reports | Provision of services to staff, departments and members | RAF RAP REU RLC RNE TCO | Completed | |
004 | Operational support to the field programme | ||||
601 | Direct operational support to regional/national projects provided by RO CPO | Technical advice to Members and field programme support | RAF RAP REU RLC RNE TCO | Completed | |
602 | Periodic project progress reports prepared by RO CPO | Provision of services to staff, departments and members | RAF RAP REU RLC RNE TCO | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Contributions to Field Programme Development and Resources Mobilization | ||||
601 | Continuous effort towards increasing size of the field programme and pipeline of project proposals in the framework of the NMTPF. | Provision of services to staff, departments and members | Completed | ||
002 | Administrative and Operational Support to Non-Emergency Field Programme | ||||
601 | Continuous effort towards increasing performance in FAO's support to member countries, including annual delivery of the "non-emergency" field programme. | Provision of services to staff, departments and members | Completed | ||
003 | Administrative and Operational Support to National Emergencies | ||||
601 | Continuous effort towards increasing performance in response to emergency situations in member countries, including annual delivery of the emergency field programme. | Provision of services to staff, departments and members | Completed | ||
004 | Coordination of FAO's country support to MDGs and Poverty Reduction Strategies | ||||
601 | Continuous active participation in non-project activities such as MDG, PRSP and other UNCT initiatives, with a view to leveraging resources for food and agriculture in the country and advocating FAO's policies and programmes. | Provision of services to staff, departments and members | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Coordinated intervention in emergency and post-crisis situations | ||||
601 | Coordinated intervention in emergency and post-crisis situations | Technical advice to Members and field programme support | Completed | ||
002 | Streamlining of FAO's response in emergency and post-crisis situations | ||||
601 | Streamlining of FAO's response in emergency and post-crisis situations | Provision of services to staff, departments and members | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Integrated support for enhanced capacities for preparedness, impact mitigation and emergency responses in crisis situation | ||||
601 | Guidelines for livestock needs assessment and interventions in emergency and post-conflict situations | Information products, systems, databases | AGA TCD TCE | Completed | |
602 | Comprehensive framework for needs assessment and response planning in emergency and post-conflict situations | Policy and legislative advice | ESA ESW TCE | Cancelled | |
603 | Strengthen disaster risk management systems of member countries and support the implementation of the International Consortium on Landslides (ICL) | Technical advice to Members and field programme support | ESW FOM TCD | Postponed | |
604 | Improved integration of livelihoods perspective into needs assessment and response planning in emergency and post-conflict situations, and strengthening of institutional aspects in the disaster risk management systems of member countries | Capacity building | ESW TCD TCE | Completed | |
605 | Testing in the field of tools and frameworks developped under this PE. | Other | AGA ESA ESW FOM NRR TCD TCE | Completed | |
606 | Development of CLIMPAG (CLimate IMPAct on AGriculture): website to access global analyses on climate impact, hotspots and water stress | Information exchange and coordination | NRR | Completed | |
607 | Provision of secretariat services for the Emergency Coordination Group (ECG) | Provision of services to staff, departments and members | TCD | Completed |
Major Output | Biennial Output | Title | Type | Contributing Divisions (Lead Division in bold) | Status |
---|---|---|---|---|---|
001 | Support to Project Formulation | ||||
601 | Support to Project Formulation | Technical advice to Members and field programme support | Completed | ||
002 | Monitoring of Project Implementation | ||||
601 | Monitoring of Project Implementation | Technical advice to Members and field programme support | Completed | ||
003 | Programme overall management | ||||
601 | Programme overall Management | Provision of services to staff, departments and members | Completed |